Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Not to be Taken Away | f6C *** | Sent x | 9 Nov, 2014 | Stanage Plantation | |||
Flying Buttress Direct | E1 5b *** | Lead β | 9 Nov, 2014 | Stanage Popular | |||
New Dawn | 7c *** | Lead dog | 2 Nov, 2014 | Malham Cove | |||
Yosemite Wall | 7a+ *** | Lead O/S | 2 Nov, 2014 | Malham Cove | |||
Brilliant, Brilliant | 6c | Lead O/S | 2 Nov, 2014 | Malham Cove | |||
Pair in a Cubicle | f7A * | Sent x | 11 Oct, 2014 | Brimham Rocks | |||
Niche Roof. | f6B | Sent x | 11 Oct, 2014 | Brimham Rocks | |||
Right Flake | f6A | Sent x | 11 Oct, 2014 | Brimham Rocks | |||
Left Flake | f6A * | Sent x | 11 Oct, 2014 | Brimham Rocks | |||
Delta Dagger | 8a ** | Lead dog | 11 Sep, 2014 | Rhossili Beach | |||
Black Adder | 6c ** | Lead β | 11 Sep, 2014 | Rhossili Beach | |||
The Groove | f7A+ | Sent x | 8 Sep, 2014 | Dinas Rock | |||
Par 3 | 6c ** | Lead rpt | 2 Sep, 2014 | Rhossili Beach | |||
Delta Dagger | 8a ** | Lead dog | 2 Sep, 2014 | Rhossili Beach | |||
Launch Pad | f6C *** | Sent x | 28 Aug, 2014 | Dinas Rock | |||
Gentle Jess Sit Down Start | f7A *** | Sent x | 28 Aug, 2014 | Dinas Rock | |||
Par 3 | 6c ** | Lead rpt | 23 Aug, 2014 | Rhossili Beach | |||
Delta Dagger | 8a ** | Lead dog | 23 Aug, 2014 | Rhossili Beach | |||
Hanging by a Thread | 6c *** | Lead rpt | 22 Aug, 2014 | Witches Point | |||
Masada | 8a+ *** | Lead dog | 22 Aug, 2014 | Witches Point | |||
Masada | 8a+ *** | Lead dog | 19 Aug, 2014 | Witches Point | |||
Liassic Lark | 7a * | Lead rpt | 19 Aug, 2014 | Witches Point | |||
Kestrel | 7c+ *** | Lead RP | 17 Aug, 2014 | Minchin Hole | |||
Par 3 | 6c ** | Lead rpt | 13 Aug, 2014 | Rhossili Beach | |||
Achilles' Wrath | 8b *** | Lead dog | 13 Aug, 2014 | Rhossili Beach |