showing 1-25
UKH
Name Grade Style Date Crag name
Nose Direct HVD ** 2nd 16/Jan Windgather Rocks
The Corner D Lead 16/Jan Windgather Rocks
Green Crack S 4a ** 2nd 16/Jan Windgather Rocks
The Staircase M * Lead 16/Jan Windgather Rocks
Bottle Buttress VD 3c * 2nd 22/Nov/15 Wintour's Leap
Cement Groove D 2nd 22/Nov/15 Wintour's Leap
Summer Daze HS 4b 2nd 31/Oct/15 Fairy Cave Quarry
The Socialist S 4a 2nd 31/Oct/15 Fairy Cave Quarry
Little Steve's Mersey Tunnel Affair S 4a 2nd 31/Oct/15 Fairy Cave Quarry
Cristel Wall VD Lead 31/Oct/15 Fairy Cave Quarry
Ten Minute Arete VD Lead 31/Oct/15 Fairy Cave Quarry
Back to Basics VD * 2nd 17/Oct/15 Fairy Cave Quarry
Cristel Wall VD 2nd 17/Oct/15 Fairy Cave Quarry
Ten Minute Arete VD 2nd 17/Oct/15 Fairy Cave Quarry
Central Rib Route III VD *** AltLd 16/Oct/15 Wintour's Leap
Wye Knot D * 2nd 16/Oct/15 Wintour's Leap
Right Hand Route HS 4b 2nd 16/Oct/15 Wintour's Leap
Idle Slabs M Lead 27/Sep/15 Brimham Rocks
Great Slab HVD 3c * 2nd 27/Sep/15 Brimham Rocks
Lichen Slab VD * 2nd 27/Sep/15 Brimham Rocks
Fag End S 4a * 2nd 27/Sep/15 Brimham Rocks
Anty Matter HS 4b 2nd 19/Sep/15 Fairy Cave Quarry
Halfway to Kansas HS 4a 2nd 19/Sep/15 Fairy Cave Quarry
Back to Basics VD * Lead 19/Sep/15 Fairy Cave Quarry
Cristel Wall VD Lead 19/Sep/15 Fairy Cave Quarry