showing 1-25
UKH
Name Grade Style Date Crag name
First's Arete VD * Lead O/S 29/Aug Windgather Rocks
The Slant Start HVD 2nd O/S 29/Aug Windgather Rocks
Overhanging Arete VD Lead O/S 29/Aug Windgather Rocks
South Buttress Arete Direct E1 5b 2nd 29/Aug Windgather Rocks
Portfolio HVS 5b * 2nd O/S 29/Aug Windgather Rocks
Physiology VD * Lead O/S 28/Aug Stanage Popular
Cave Buttress S 4b ** 2nd O/S 27/Aug Stanage North
Solomon's Crack VD * Lead O/S 07/Aug Froggatt Edge
Flake Gully VD * 2nd 07/Aug Froggatt Edge
Beta VD Lead O/S 07/Aug Froggatt Edge
Sickle Buttress S 4a * 2nd 07/Aug Froggatt Edge
Flying Buttress HVD 4a *** 2nd O/S 13/Jul Stanage Popular
Beech Tree Wall (Birch Tree Wall) HS 4b * Lead dnf 13/Jul Stanage Popular
Ride Him Cowboy VS 5a 2nd 10/Jul Stanage Plantation
Spur Slab D Lead 10/Jul Stanage Plantation
Leaning Wall Direct HS 5a * TR O/S 07/Jun Burbage North
Triangle Crack HVD 4a * Lead dog 07/Jun Burbage North
Triangle Buttress Direct S 4a * 2nd O/S 07/Jun Burbage North
Triangle Buttress Arete VD * Lead O/S 07/Jun Burbage North
Cranberry Crack VD Lead O/S 07/Jun Burbage North
Carborundum VS 5a TR O/S 06/Jun Stanage Popular
Plate Glass VS 4c * TR O/S 06/Jun Stanage Popular
Small Crack VD * Lead 06/Jun Stanage Popular
It's a Cracker S 4b * 2nd 15/May Stanage North
Tango Crack VD * Lead 15/May Stanage North