Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Devotoed | VS 5a | 2nd | 10 Aug, 2013 | Roaches Skyline | |||
Crack and Corner | S 4b *** | Lead O/S | 5 Aug, 2013 | Stanage Popular | |||
Via Media | VS 4c ** | Lead O/S | 5 Aug, 2013 | Stanage Popular | |||
Central Trinity | VS 4c ** | 2nd | 5 Aug, 2013 | Stanage Popular | |||
Balcony Buttress | S 4a *** | Lead O/S | 5 Aug, 2013 | Stanage Popular | |||
Dover's Wall, Route 4 | VS 4b * | 2nd | 5 Aug, 2013 | Stanage Popular | |||
Dover's Wall, Route 1 | S 4b * | Lead O/S | 5 Aug, 2013 | Stanage Popular | |||
Cooper's Crack | S 4b ** | Lead O/S | 27 Jul, 2013 | Dovestones Edge | |||
Stirrup | S 4a * | Lead O/S | 27 Jul, 2013 | Dovestones Edge | |||
Nozag | VS 4c *** | 2nd | 16 Jul, 2013 | Castle Naze | |||
Footstool Left | S 4a | Lead O/S | 16 Jul, 2013 | Castle Naze | |||
Scoop Face | HVS 5a *** | 2nd | 16 Jul, 2013 | Castle Naze | |||
The Flywalk | S 4a * | 2nd | 16 Jul, 2013 | Castle Naze | |||
The Niche | S 4a ** | Lead O/S | 16 Jul, 2013 | Castle Naze | |||
Overlapping Wall | S 4a | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Right Triplet Crack | S 4a | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Route 1.5 | HVS 4c * | 2nd | 14 Jul, 2013 | Windgather Rocks | |||
Bulging Arête | S 4a | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Middle Buttress Arête | VD * | 2nd | 14 Jul, 2013 | Windgather Rocks | |||
Mississippi Crack | S 4a ** | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Chockstone Chimney | D * | 2nd | 14 Jul, 2013 | Windgather Rocks | |||
North Buttress Arête Direct | VS 5a ** | 2nd | 14 Jul, 2013 | Windgather Rocks | |||
Green Crack | S 4a ** | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Black Slab | S 4a * | Lead O/S | 14 Jul, 2013 | Windgather Rocks | |||
Green Slab | S 4b * | 2nd | 14 Jul, 2013 | Windgather Rocks |