Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Arete | VD ** | Lead rpt | RodEvs | 21 Apr | Idwal Slabs (aka Cwm Idwal) | ||
Lazarus | S 4a *** | Lead rpt | RodEvs | 21 Apr | Idwal Slabs (aka Cwm Idwal) | ||
Tennis Shoe | HS 4b *** | Lead rpt | RodEvs | 21 Apr | Idwal Slabs (aka Cwm Idwal) | ||
Bauxed | HVS 5a ** | Lead O/S | Rlfevans | 14 Apr | Pen Trwyn | ||
The Really Exciting Climb | HVS 5a ** | Lead O/S | Rlfevans | 14 Apr | Pen Trwyn | ||
Green Gut | HS 4a *** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Diamond Crack | HS 4b ** | Lead O/S | RodEvs | 6 Apr | Froggatt Edge | ||
Three Pebble Slab | HVS 5a *** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Tody's Wall | HVS 5a *** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Terrace Crack | HS 4b ** | Lead O/S | RodEvs | 6 Apr | Froggatt Edge | ||
Sunset Slab | HVS 4b *** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Sunset Crack | HS 4b ** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Heather Wall | HVD 3b *** | Lead rpt | RodEvs | 6 Apr | Froggatt Edge | ||
Wen | HVS 5a ** | Lead O/S | Rlfevans | 2 Apr | Gogarth North Stack and Main... | ||
Breaking the Barrier | E1 5b *** | Lead O/S | Cbulman | 31 Mar | Holyhead Mountain | ||
The Gauntlet | HVS 5a ** | 2nd O/S | Cbulman, Jim blackford | 31 Mar | Gogarth North Stack and Main... | ||
Black and Tan | VS 4c ** | Lead O/S | Harriet Bibby | 30 Mar | Holyhead Mountain | ||
Tension | VS 4b *** | Lead O/S | Harriet Bibby | 30 Mar | Holyhead Mountain | ||
Croton Oil | HVS 5a *** | Lead O/S | Rlfevans | 26 Mar | Rivelin Edge | ||
Better Late Than Never | E1 5a * | Lead O/S | Rlfevans | 26 Mar | Rivelin Edge | ||
Nightmare | S 4a ** | Lead O/S | Rlfevans | 17 Feb | Avon Gorge (Sea Walls Area) | ||
Lost Horizon | VS 5a *** | Lead O/S | Rlfevans | 16 Feb | Baggy Point | ||
Shangri-La | S 4a *** | Lead O/S | Rlfevans | 16 Feb | Baggy Point | ||
The Brink of Solarity | HVS 5a ** | Lead O/S | Rlfevans | 12 Feb | Portishead Quarry | ||
Pharos | HS 4b * | Lead O/S | Rlfevans | 12 Feb | Portishead Quarry |