Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Y Gribin (Summer) | Grade-1 ** | Solo | 21 Sep, 2019 | Snowdon (Yr Wyddfa) | |||
East Ridge of Y Garn | Grade-2 ** | Solo | 21 Sep, 2019 | Y Garn | |||
Idwal Staircase/Continuation | Grade-3 *** | Solo | 21 Sep, 2019 | Idwal Slabs (aka Cwm Idwal) | |||
Tower Rib | M * | Solo | 21 Sep, 2019 | Cwm Cneifion | |||
Cneifion Arete | D *** | Solo | 19 Sep, 2019 | Cwm Cneifion | |||
The Snowdon Horseshoe (Summer) | Grade-1 *** | - | 18 Sep, 2019 | Crib Goch | |||
Crib Goch - Crib Y Ddysgl Traverse (Summer) | Grade-1 ** | - | 18 Sep, 2019 | Crib Goch | |||
East Ridge (Summer) | Grade-1 ** | - | 18 Sep, 2019 | Crib Goch | |||
Bastow Gully | Grade-2 | Solo O/S | 14 Sep, 2019 | Tryfan | |||
Daear Ddu Ridge | Grade-1 ** | - | 13 Sep, 2019 | Carnedd Moel Siabod | |||
Ochre Slab Route II | S 4a ** | 2nd | 29 Aug, 2019 | Bosigran | |||
Autumn Flakes | HS 4b ** | AltLd | 27 Aug, 2019 | Bosigran | |||
Nameless | VS 4c *** | AltLd O/S | 27 Aug, 2019 | Bosigran | |||
Africa Route | VS 5a ** | 2nd RP | 22 Aug, 2019 | Sennen | |||
Vertical Crack | VS 4c ** | Lead | 20 Aug, 2019 | Sennen | |||
Skewcrack | S 4b * | Lead | 13 Aug, 2019 | Sennen | |||
Cneifion Arete | D *** | Solo | 15 Sep, 2018 | Cwm Cneifion | |||
Bosigran Ridge a.k.a Commando Ridge | VD *** | AltLd | 5 Sep, 2018 | Bosigran Ridge Area | |||
Ochre Slab Route II | S 4a ** | 2nd | 30 Aug, 2018 | Bosigran | |||
Doorway | S 4a ** | 2nd | 30 Aug, 2018 | Bosigran | |||
Right Angle | HS 4b *** | AltLd | 30 Aug, 2018 | Gurnard's Head | |||
Dolmen Ridge | Grade-3 *** | - | 19 Aug, 2018 | Glyder Fach | |||
Demo Route | HS 4b *** | Lead O/S | 13 Aug, 2018 | Sennen |