Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Joe's Route | VS 4c ** | AltLd O/S | Andy H | 30 Jan, 2010 | Wintour's Leap | ||
Left Hand Route | HS 4b *** | AltLd O/S | Andy H | 30 Jan, 2010 | Wintour's Leap | ||
Son of Koflack | III | 2nd O/S | Allan Watson | 9 Jan, 2010 | Cwmyoy (The Darren) | ||
King Koflach and the Coconuts | IV | Lead O/S | Allan Watson | 9 Jan, 2010 | Cwmyoy (The Darren) | ||
Charity | S ** | Lead O/S | becky, marc and sharon | 31 Oct, 2009 | Idwal Slabs (aka Cwm Idwal) | ||
Tennis Shoe | HS 4b *** | Lead O/S | becky, marc and sharon | 30 Oct, 2009 | Idwal Slabs (aka Cwm Idwal) | ||
The Sloth | HVS 5a *** | 2nd O/S | Allan Watson | 17 Oct, 2009 | Roaches Upper Tier | ||
Mockingbird | HVS 4c * | Lead O/S | Allan Watson | 3 Oct, 2009 | Symonds Yat | ||
Red Rose Speedway | HVS 5a *** | 2nd O/S | Allan Watson | 3 Oct, 2009 | Symonds Yat | ||
Aqua | VS 4b * | Lead O/S | Allan Watson | Oct, 2009 | Roaches Upper Tier | ||
Tower Ridge | D *** | Solo O/S | Allan Watson | Sep, 2009 | Ben Nevis | ||
Minerva | S 4b | Lead O/S | wayne | Sep, 2009 | Symonds Yat | ||
Perimeter | HS 4b | Lead O/S | wayne | Sep, 2009 | Symonds Yat | ||
Homo Erectus | E5 6a | TR O/S | wayne | Sep, 2009 | Symonds Yat | ||
Ash Tree Slabs | VD *** | Lead O/S | Allan Watson | Sep, 2009 | Gimmer Crag | ||
Kipling Groove | HVS 5a *** | AltLd O/S | Allan Watson | Sep, 2009 | Gimmer Crag | ||
Route 2 | HS 4b *** | Lead O/S | Allan Watson | Sep, 2009 | Raven Crag (Walthwaite) | ||
Enterprize | VS 4b ** | AltLd O/S | Allan Watson | Sep, 2009 | Raven Crag (Walthwaite) | ||
Tritus | HVS 5a ** | AltLd O/S | Allan Watson | Sep, 2009 | Raven Crag (Walthwaite) | ||
Revelation | HS 4b *** | AltLd O/S | Allan Watson | Sep, 2009 | Raven Crag (Langdale) | ||
Bilberry Buttress | VS 4c *** | AltLd O/S | Allan Watson | Sep, 2009 | Raven Crag (Langdale) | ||
Holly Tree Direct | HVS 5a ** | AltLd O/S | Allan Watson | Sep, 2009 | Raven Crag (Langdale) | ||
Outlook Slab | VS 5a * | Lead O/S | becky, marc and sharon | 31 Aug, 2009 | Stanage Plantation | ||
Helfenstein's Struggle | HVD 4a ** | Lead O/S | becky, marc and sharon | 31 Aug, 2009 | Stanage Plantation | ||
Wall End Crack Direct | HS 4b ** | Lead O/S | becky, marc and sharon | 31 Aug, 2009 | Stanage Plantation |