Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Problem 23 | VB | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Muffin Top | V1 * | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Problem 11 | V0 | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Critter | V1 ** | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Splitter | V1 ** | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Problem 2 | VB | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Problem 1 | V0- | Sent | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Birdsong | f6C * | Sent x | John, Celyn Thorpe | 24 Aug, 2022 | Settle Earth Boulders | ||
Phat Arete / Problem 20 (Rockfax) | f6C * | Sent | Celyn Thorpe | 23 Aug, 2022 | St. Bees Head | ||
Flip Flop Traverse / Problem 14 (Rockfax) | f6C | Sent | Celyn Thorpe | 23 Aug, 2022 | St. Bees Head | ||
Problem 11 (Rockfax) | V3 | Sent | Celyn Thorpe | 23 Aug, 2022 | St. Bees Head | ||
Apiary Arete | V1 *** | Sent O/S | Celyn Thorpe | 23 Aug, 2022 | St. Bees Head | ||
Tunnel Wall Righthand-Lefthand | f7A+ | Sent x | kmaxwell, Tim Peck | 10 Aug, 2022 | Cromlech boulders | ||
Lady Boy Arete | f6C * | Sent x | Luke Clarke, Tim Peck | 18 Jun, 2022 | Cwm Trwsgl Boulders | ||
Pachacamac Crack Direct | f6B+ | Sent x | kmaxwell, Stu | 15 Apr, 2022 | Pac man boulders | ||
Pachacamac Crack | f6C | Sent x | kmaxwell, Stu | 15 Apr, 2022 | Pac man boulders | ||
Prisoners of the Sun Stand Start | f6C | Sent x | kmaxwell, Stu | 15 Apr, 2022 | Pac man boulders | ||
Snowy | f6B+ | Sent x | Stu, kmaxwell | 15 Apr, 2022 | Pac man boulders | ||
After Migneint | f7C * | Sent x | Celyn Thorpe | 6 Mar, 2022 | Carreg y Foel Gron | ||
Rock for Light | f7B+ ** | Sent x | Tim Peck | 21 Sep, 2021 | Cromlech boulders | ||
Disasterpiece RH Exit | f7C | Sent x | Tim Peck | 21 Sep, 2021 | Cromlech boulders | ||
Cromlech Roof Crack RH Exit (Low Start) | f7B | Sent x | Tim Peck | 21 Sep, 2021 | Cromlech boulders | ||
Cromlech Roof Crack RH Exit | f7A * | Sent β | Tim Peck | 21 Sep, 2021 | Cromlech boulders | ||
Swiss crumble | f7B * | Sent x | Tim Peck, kmaxwell | 28 Aug, 2021 | Llyn Coedty | ||
Swiss crumble stand | f6A * | Sent x | Tim Peck, kmaxwell | 28 Aug, 2021 | Llyn Coedty |