showing 1-25
UKH
Name Grade Style Date Crag name
Suspension S 4a * - 07/Jul/10 Subluminal
High Street D * - 07/Jul/10 Subluminal
Gangway S 4a * - 07/Jul/10 Subluminal
First Corner S 4b ** - 07/Jul/10 Subluminal
Face S 4a * - 07/Jul/10 Subluminal
Curving Crack S 4a * - 07/Jul/10 Subluminal
Bypass S 4b * - 07/Jul/10 Subluminal
Balcony HS 4b ** - 07/Jul/10 Subluminal
Oracle HS 4b ** 2nd 12/Sep/09 Bamford Edge
Bamford Wall S 4a ** 2nd 12/Sep/09 Bamford Edge
The Happy Wanderer HVS 5a ** Lead 12/Sep/09 Bamford Edge
Parliament E1 5c * 2nd 12/Sep/09 Bamford Edge
Bracken Crack VD * Lead 12/Sep/09 Bamford Edge
K Buttress Slab VD * Solo 12/Sep/09 Bamford Edge
P.M.C.1 HS 4a *** 2nd 24/Jun/09 Curbar Edge
The Bear Hunter E1 5b ** Lead 24/Jun/09 Curbar Edge
Cioch Left-Hand HVS 5a * 2nd 24/Jun/09 Curbar Edge
Drizzle E3 6a ** TR 21/Jun/09 Hobson Moor Quarry
Shivers Arete E1 5b ** 2nd O/S 20/Jun/09 Wilton 3
Suicide Wall E1 5c *** AltLd 19/Jun/09 Bosigran
Demo Route HS 4b *** 2nd 17/Jun/09 Sennen
Vertical Crack VS 4c ** Lead O/S 17/Jun/09 Sennen
Overhanging Wall VS 4c Lead O/S 17/Jun/09 Sennen
Golva E2 5c ** Lead dnf 17/Jun/09 Sennen
Doorpost HS 4b *** AltLd 16/Jun/09 Bosigran