Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Ett mold i byxor | 4b | 2nd O/S | 1 Jul, 2015 | Ryssgraven | |||
Kollontaj | 4b | Lead O/S | 1 Jul, 2015 | Ryssgraven | |||
Triangle Buttress Direct | S 4a * | 2nd | pete1185 | 27 Apr, 2013 | Burbage North | ||
Time to be Had | HVD * | 2nd | pete1185 | 7 Apr, 2013 | Roaches Skyline | ||
Bad Poynt | D * | Lead | pete1185 | 7 Apr, 2013 | Roaches Skyline | ||
Days Gone By | S 4a * | Lead | pete1185 | 7 Apr, 2013 | Roaches Skyline | ||
Alpha Arête | S 4a * | 2nd | pete1185 | 7 Apr, 2013 | Roaches Skyline | ||
The Nithin | S 4a * | 2nd | pete1185 | 6 Apr, 2013 | Castle Naze | ||
Studio | HS 4b ** | 2nd | pete1185 | 6 Apr, 2013 | Castle Naze | ||
The Flywalk | S 4a * | 2nd | pete1185 | 6 Apr, 2013 | Castle Naze | ||
Zig-a-Zag-a | VD * | Lead | pete1185 | 6 Apr, 2013 | Castle Naze | ||
Sheltered Crack | VD * | Lead | pete1185 | 6 Apr, 2013 | Castle Naze | ||
Fabrikkfossen | WI-3 *** | 2nd O/S | Dom Koole, pete1185 | 4 Feb, 2013 | Rjukan Centre | ||
Pentium | WI-3 * | 2nd O/S | Dom Koole, pete1185 | 3 Feb, 2013 | Lower Gorge | ||
Skrotfossen | WI-3 | 2nd O/S | Dom Koole, pete1185 | 3 Feb, 2013 | Lower Gorge | ||
Camillas Foss | WI-3 *** | 2nd O/S | Dom Koole, pete1185 | 3 Feb, 2013 | Lower Gorge | ||
Juledusj | WI-3 * | 2nd O/S | Dom Koole, pete1185 | 2 Feb, 2013 | Ozzimosis | ||
Julevask | WI-2 | TR O/S | Dom Koole, pete1185 | 2 Feb, 2013 | Ozzimosis | ||
Årsdagen | WI-2 | Lead O/S | Dom Koole, pete1185 | 2 Feb, 2013 | Ozzimosis | ||
Svada | WI-2 | Lead O/S | Dom Koole, pete1185 | 2 Feb, 2013 | Ozzimosis | ||
Klassisk 4 | WI-3 * | TR O/S | Dom Koole, pete1185 | 2 Feb, 2013 | Ozzimosis | ||
Crack and Corner | S 4b *** | 2nd | pete1185 | 5 Jun, 2011 | Stanage Popular | ||
Physiology | VD * | 2nd | pete1185 | 5 Jun, 2011 | Stanage Popular | ||
Mast Gully Crack | HS 4b * | 2nd | pete1185 | 4 Jun, 2011 | Birchen Edge | ||
Reef Knot | S 4b * | Lead | pete1185 | 4 Jun, 2011 | Birchen Edge |