UKC

Logbook for Phil Layton

View Logbook entries on a map
480 entries in this logbook showing 76-100
View logged summits on UKH
Name Grade Style Partner(s) Notes Feedback Date Crag name
Happy Return 4c ** Lead O/S Pete Frost 5 Sep, 2016 Castle Inn Quarry
Mynydd Marian VS 4c ** 2nd RP Pete Frost 5 Sep, 2016 Castle Inn Quarry
Ffion Gwyn HVS 4c Lead O/S Pete Frost 2 Sep, 2016 Lech Drws Y Coed
Copper Load Direct Indirect. E1 5b ** 2nd O/S Pete Frost 2 Sep, 2016 Lech Drws Y Coed
Copper Load HVS 5b 2nd O/S Pete Frost 2 Sep, 2016 Lech Drws Y Coed
Y Pregethwr VS 5a Lead O/S Pete Frost 2 Sep, 2016 Lech Drws Y Coed
Excalibur VD ** Solo O/S   30 May, 2016 Craig Penmaen Brith
The Ordinary Route D ** Solo O/S   5 May, 2016 Idwal Slabs (aka Cwm Idwal)
Looning the Tube E1 5a *** Lead O/S Pete Frost 3 May, 2016 Australia
Seams the Same E1 5b ** Lead O/S Pete Frost 3 May, 2016 Serengeti
Seamstress VS 4c ** Lead O/S Pete Frost 3 May, 2016 Serengeti
Ffion Gwyn HVS 4c Solo O/S   20 Mar, 2016 Lech Drws Y Coed
Angel Pavement HS 4b ** AltLd O/S Pete Frost 19 Mar, 2016 Craig y Bera
Sentries Ridge Grade-3 *** AltLd O/S Pete Frost 19 Mar, 2016 Craig y Bera
Sidings Enigma 6a * 2nd O/S Pete_Frost 18 Mar, 2016 Australia
Gnat Attack E1 5c ** Lead O/S Pete Frost 18 Mar, 2016 Bus Stop Quarry
The Railway children 6a ** Lead O/S Pete Frost 18 Mar, 2016 Australia
Hogwarts Express 5c * Lead O/S Pete Frost 18 Mar, 2016 Australia
Those who climb clearly marked projects... 5c * Lead O/S Pete Frost 18 Mar, 2016 Australia
Ivor the Engine 5a * Lead O/S Pete Frost 18 Mar, 2016 Australia
'N' Gauge 5c * Lead O/S Pete Frost 18 Mar, 2016 Australia
Orangutang Overhang 6a+ ** Lead O/S Pete Frost 18 Mar, 2016 Australia
Shorty's Dyno (Short Person's Method) 6c+ Lead O/S Pete Frost 18 Mar, 2016 Australia
Pinnacle Ridge Variation VD * Solo O/S   15 Mar, 2016 Craig y Bera
Comfort Zone 5a * Solo O/S   13 Mar, 2016 Bus Stop Quarry
Loading Notifications...