Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Double Overhang | S 4a * | Lead O/S | 25 Feb, 2012 | Baggy Point | |||
In-Between | VD ** | 2nd β | 11 Feb, 2012 | Bosigran | |||
Alison Rib | D *** | 2nd rpt | 11 Feb, 2012 | Bosigran | |||
Ochre Slab Route I | HVS 5a ** | Lead O/S | 11 Feb, 2012 | Bosigran | |||
Doorway | S 4a ** | Lead rpt | 11 Feb, 2012 | Bosigran | |||
Ochre Slab Route I | HVS 5a ** | Lead O/S | 11 Feb, 2012 | Bosigran | |||
Main Face Climb | D ** | 2nd O/S | 22 Jan, 2012 | Sennen | |||
Andrew | S 4a ** | AltLd rpt | 22 Jan, 2012 | Bosigran | |||
Kate | VD * | Lead O/S | 22 Jan, 2012 | Bosigran | |||
Oread | HVD * | 2nd O/S | 12 Jan, 2012 | Bosigran | |||
Big Top | VD * | AltLd | 11 Jan, 2012 | Bosigran | |||
Andrew | S 4a ** | Lead O/S | 11 Jan, 2012 | Bosigran | |||
Southwest Ridge via The Bad Step (Mauvais Pas) | VD ** | Solo | 1 Aug, 2007 | Sgùrr Alasdair | |||
Stone Man | VS 4c | 2nd O/S | 2000 | Lower Sharpnose Point | |||
The Crow's Nest | VS 4c ** | Lead O/S | 3 May, 1992 | Birchen Edge | |||
Flight | VS 4b * | Lead O/S | 15 Mar, 1992 | Symonds Yat | |||
Grobbler | VS 4c | Lead O/S | 15 Mar, 1992 | Symonds Yat | |||
The Wrinkle | VD ** | AltLd O/S | 14 Apr, 1991 | Carreg Wastad | |||
Black Slab | D ** | Lead O/S | Mar, 1991 | Bosigran | |||
Anvil Chorus | VS 4c *** | Lead O/S | Mar, 1991 | Bosigran | |||
In-Between | VD ** | Lead O/S | Mar, 1991 | Bosigran | |||
Alison Rib | D *** | Solo O/S | Mar, 1991 | Bosigran | |||
Fafnir | VD * | Solo O/S | Mar, 1991 | Bosigran | |||
Cannonball Wall | VD * | Solo O/S | 2 Sep, 1990 | Birchen Edge | |||
Cannonball Crack | S 3c | Solo O/S | 2 Sep, 1990 | Birchen Edge |