Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Second Corner | 5.7 | Lead O/S | Ian Marsh | 20 May, 2005 | Wasootch Slabs | ||
B10, The Funnel | 5.8 * | Lead O/S | Ian Marsh | 20 May, 2005 | Wasootch Slabs | ||
B5 | 5.7 | Lead O/S | Ian Marsh | 20 May, 2005 | Wasootch Slabs | ||
B4 | 5.6 | Lead O/S | Ian Marsh | 20 May, 2005 | Wasootch Slabs | ||
Arch Slab | VS 4c *** | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Spouse Crack | S 4a * | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Inverted V | HVS 4c * | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Right Corner I | D * | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Initiation Flake | S 4a ** | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Left Corner I | M * | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Wall Climb | D * | - | 4 Aug, 2004 | Three Cliffs Bay | |||
Stormwatch | HS 4b * | Lead O/S | 3 Aug, 2004 | Limeslade Crag | |||
January Jigsaw (Summer) | S *** | AltLd O/S | 8 Jul, 2004 | Buachaille Etive Mor | |||
January Jigsaw (Summer) | S *** | AltLd O/S | 8 Jul, 2004 | Buachaille Etive Mor | |||
Pandora Direct | VS 4c | AltLd O/S | 6 Jul, 2004 | Polldubh Crags, Glen Nevis | |||
Pinnacle Ridge | S * | AltLd O/S | 5 Jul, 2004 | Polldubh Crags, Glen Nevis | |||
Rechts Direkt | IV+ | Lead O/S | 28 May, 2004 | Ziegel Wies | |||
Rechte Platte | V- | Lead O/S | 28 May, 2004 | Ziegel Wies | |||
Linke Platte | VI | Lead O/S | 28 May, 2004 | Ziegel Wies | |||
Halbrechte Platte | V- | Lead O/S | 28 May, 2004 | Ziegel Wies | |||
Rechts Direkt | IV+ | Lead O/S | 27 Jul, 2003 | Ziegel Wies | |||
Rechte Platte | V- | Lead O/S | 27 Jul, 2003 | Ziegel Wies | |||
Rechts Direkt | IV+ | Lead O/S | Riki Tanner, Shammasss Khan | 18 May, 2002 | Ziegel Wies | ||
Rechte Platte | V- | Lead O/S | Riki Tanner, Shammasss Khan | 18 May, 2002 | Ziegel Wies | ||
Linke Platte | VI | Lead O/S | Riki Tanner, Shammasss Khan | 18 May, 2002 | Ziegel Wies |