Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Right-Hand Groove | VD * | 2nd | Griz | Oct, 2003 | Huntly's Cave | ||
Cave Route | HS 4b *** | Lead O/S | Griz | Oct, 2003 | Huntly's Cave | ||
The Grack Center | 5.6 *** | AltLd O/S | Ivor | 30 Sep, 2003 | Glacier Point Apron | ||
Swan Slab Gully | 5.6 ** | Lead O/S | Andy Lockwood | 25 Sep, 2003 | Swan Slab | ||
Hanging Flake | 5.6 ** | Lead O/S | Andy Lockwood | 25 Sep, 2003 | Swan Slab | ||
Huggy Bear | VS 4c | Lead O/S | liz-264 | Sep, 2003 | Cummingston | ||
Zee Tree | 5.7 *** | 2nd | Ivor | Sep, 2003 | Pywiack Dome | ||
Mere Image | 5.7 *** | Lead O/S | Jim Jarvis | Sep, 2003 | Bunny Slopes | ||
Biscuit and Gravy | 5.8 ** | 2nd | Jim Jarvis | Sep, 2003 | Bunny Slopes | ||
Hot Crossed Buns | 5.6 *** | Lead O/S | Jim Jarvis | Sep, 2003 | Bunny Slopes | ||
Cathedral Peak Southeast Buttress A B and C | 5.6 *** | AltLd O/S | Andy Lockwood, liz-264 | Sep, 2003 | Cathedral Peak | ||
Green Crack | VS 4c | Lead O/S | Griz | Sep, 2003 | Cummingston | ||
Centre | VS 4b ** | Lead β | liz-264 | Sep, 2003 | Cummingston | ||
Back Passage | M | Solo O/S | Sep, 2003 | Cummingston | |||
Lumside Crack | S | Lead O/S | liz-264 | Aug, 2003 | Cummingston | ||
Left | VS 5a ** | Lead O/S | liz-264 | Aug, 2003 | Cummingston | ||
Diedre of Doubt | HVS 5a ** | Lead rpt | liz-264 | Aug, 2003 | Cummingston | ||
Right | HVS 5b ** | TR | Griz | Aug, 2003 | Cummingston | ||
Staircase Crack | S | Lead O/S | Griz | Jul, 2003 | Cummingston | ||
Flying Buttress, Left Side | VD | 2nd | Griz | Jul, 2003 | Cummingston | ||
Snotty Nose | D | Lead O/S | Griz | Jul, 2003 | Cummingston | ||
The Artful Dodger | HVS 5a | TR | Griz | 2003 | Cummingston | ||
Doubtless Wall | S * | Lead O/S | Griz | 2003 | Cummingston | ||
Old Peg Groove | VS 4c * | Lead O/S | Rachel, ian peachey | 2003 | Cummingston | ||
Jack's Rake | Grade-1 *** | Solo | 2000 | Pavey Ark |