Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Niche ArĂȘte | VS 5a ** | Lead O/S | studly84 | 22 Apr, 2006 | Castle Naze | ||
The Nithin | S 4a * | Lead O/S | studly84 | 22 Apr, 2006 | Castle Naze | ||
Scoop Face | HVS 5a *** | Lead O/S | studly84 | 22 Apr, 2006 | Castle Naze | ||
Tennis Shoe | HS 4b *** | AltLd O/S | studly84 | 15 Apr, 2006 | Idwal Slabs (aka Cwm Idwal) | ||
Arete Number 1 | VD | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Smooth Chimney Outside Route | HS 4b | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Angel's Crawl | VS 4c | 2nd O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Face Climb Number 2 | VD | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Arete Number 2 | VD 4a | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Face Climb Number 1 | D | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Brassington Crack Arete | S 4a | Lead O/S | studly84 | 25 Mar, 2006 | Brassington (Rainster Rocks) | ||
Easy Gully Wall | HVD 4a * | 2nd O/S | studly84 | 5 Mar, 2006 | Roaches Upper Tier | ||
Fledgling's Climb | HS 4a * | Lead O/S | studly84 | 5 Mar, 2006 | Roaches Lower Tier | ||
Raven Rock Gully Left-hand | VS 4b * | Lead O/S | Iain Woodhouse | 27 Feb, 2006 | Roaches Lower Tier | ||
Raven Rock Gully | D ** | Lead O/S | Iain Woodhouse | 27 Feb, 2006 | Roaches Lower Tier | ||
Director | VS 4b * | 2nd O/S | studly84 | 25 Feb, 2006 | Windgather Rocks | ||
Nose Direct | HVD ** | Lead O/S | studly84 | 25 Feb, 2006 | Windgather Rocks | ||
High Buttress ArĂȘte | D *** | 2nd O/S | studly84 | 25 Feb, 2006 | Windgather Rocks | ||
Left Triplet Crack | M | Lead O/S | studly84 | 25 Feb, 2006 | Windgather Rocks | ||
Top Totty | 5a | Lead O/S | studly84 | 18 Feb, 2006 | Harpur Hill Quarry | ||
The Naked Spur | 5a * | Lead O/S | studly84 | 18 Feb, 2006 | Harpur Hill Quarry | ||
Overbored | 5b | Lead O/S | studly84 | 18 Feb, 2006 | Harpur Hill Quarry | ||
Heather Slab | S 3c * | Lead O/S | studly84 | 11 Feb, 2006 | Roaches Upper Tier | ||
Maud's Garden | HVD 3c *** | Lead O/S | studly84 | 11 Feb, 2006 | Roaches Upper Tier | ||
Swinger | VS 4c | Lead O/S | studly84 | 11 Feb, 2006 | Roaches Lower Tier |