Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Three Pebble Slab | HVS 5a *** | Lead O/S | rockcat | 1 Mar, 2009 | Froggatt Edge | ||
Two-sided Triangle | HVS 5b * | Lead O/S | rockcat | 1 Mar, 2009 | Froggatt Edge | ||
Tody's Wall | HVS 5a *** | Lead O/S | rockcat | 1 Mar, 2009 | Froggatt Edge | ||
Heather Wall | HVD 3b *** | Solo O/S | technicolour troll | 1 Mar, 2009 | Froggatt Edge | ||
Sunset Crack | HS 4b ** | Lead O/S | rockcat | 1 Mar, 2009 | Froggatt Edge | ||
Sunset Slab | HVS 4b *** | Lead O/S | rockcat | 1 Mar, 2009 | Froggatt Edge | ||
North Climb | S 4a * | Solo O/S | technicolour troll | 1 Mar, 2009 | Froggatt Edge | ||
The warm up | V0- | Sent O/S | fran04 | 27 Feb, 2009 | Sunny Wall | ||
The Ramp (Sit down start) | V2 | Sent x | fran04 | 27 Feb, 2009 | Sunny Wall | ||
V is for ? | V2 | Sent x | fran04 | 27 Feb, 2009 | Sunny Wall | ||
The Cake Walk | 6b+ ** | TR RP | Shunt | 27 Feb, 2009 | Castle Inn Quarry | ||
Warm Up Slab Return Lap | V1 * | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
Doorbell | V2 ** | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
5c Wall Arete | V3 ** | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
5c Wall (lefthand start) | V2 ** | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
5c Wall (righthand start) | V2 * | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
The Undercut Problem | V2 ** | Sent x | rockcat | 21 Feb, 2009 | Angel Bay | ||
The Descent Crack | V0- ** | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
The Crack | V0- ** | Sent O/S | rockcat | 21 Feb, 2009 | Angel Bay | ||
Problem 2 | V1 | Sent rpt | rockcat | 21 Feb, 2009 | Angel Bay | ||
Mind Light | 6a+ | Lead O/S | rockcat | 21 Feb, 2009 | Llanddulas Cave | ||
Mogadishu | 4c * | Lead rpt | technicolour troll | 21 Feb, 2009 | Castle Inn Quarry | ||
Finale | 5a * | Lead rpt | technicolour troll | 21 Feb, 2009 | Castle Inn Quarry | ||
Route 1 | 5a *** | Lead rpt | technicolour troll | 21 Feb, 2009 | Castle Inn Quarry | ||
Route 2 | 6a ** | Lead rpt | technicolour troll | 21 Feb, 2009 | Castle Inn Quarry |