Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Pete's Ploy | E2 5b * | Lead RP | rosie atkinson | 24 Apr, 2009 | Ravensheugh Crag | ||
Pendulum | VS 4c *** | Lead O/S | rosie atkinson | 24 Apr, 2009 | Ravensheugh Crag | ||
Right Parallel Crack | VD | Solo | 24 Apr, 2009 | Ravensheugh Crag | |||
Central Parallel Crack | VD | Solo | 24 Apr, 2009 | Ravensheugh Crag | |||
Left Parallel Crack | VD | Solo | 24 Apr, 2009 | Ravensheugh Crag | |||
Flake Crack | S 4b *** | Solo O/S | 16 Aug, 2008 | Kyloe Crag (Kyloe Out) | |||
Pinup | E2 6a | Lead O/S | rosie atkinson | 16 Aug, 2008 | Back Bowden Doors | ||
Hazelrigg Wall | E1 5c * | Lead O/S | rosie atkinson | 16 Aug, 2008 | Back Bowden Doors | ||
Wall and Crack | S 4b * | Lead O/S | rosie atkinson | 16 Aug, 2008 | Back Bowden Doors | ||
March Line | VD ** | Lead O/S | rosie atkinson | 16 Aug, 2008 | Back Bowden Doors | ||
Old Corner | HVD * | Solo | 13 Aug, 2008 | Brimham Rocks | |||
West face eliminate | E2 6a | TR O/S | 7 Aug, 2008 | Slipstones | |||
Tranmire Crack | VS 4c | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Tranmire Arete | S 4a ** | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Petch's Groove | S 4a | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Escalator | HVS 5b ** | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Not So Tight Chimney | HVD * | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Overhanging Crack | VD | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Little Corner | D | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Heather Crack | D | Lead O/S | 7 Aug, 2008 | Slipstones | |||
Blucher | VS 4c * | Lead O/S | rosie atkinson | 6 Aug, 2008 | Ilkley (Cow and Calf) | ||
Napoleon | VS 4c * | Lead O/S | rosie atkinson | 6 Aug, 2008 | Ilkley (Cow and Calf) | ||
Fairy Steps | HVD * | Lead O/S | rosie atkinson | 6 Aug, 2008 | Ilkley (Cow and Calf) | ||
S Crack | VS 4c *** | Lead O/S | rosie atkinson | 6 Aug, 2008 | Ilkley (Cow and Calf) | ||
Square Root | HS 4b * | Solo | 5 Aug, 2008 | Brimham Rocks |