Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Problem 20 | V1 * | Sent rpt | 3 May, 2009 | Angel Bay | |||
Problem 19 | V0 | Sent | 3 May, 2009 | Angel Bay | |||
The Undercut Problem | V2 ** | Sent x | 3 May, 2009 | Angel Bay | |||
The Descent Crack | V0- ** | Sent rpt | 3 May, 2009 | Angel Bay | |||
The Crack | V0- ** | Sent | 3 May, 2009 | Angel Bay | |||
Problem 2 | V1 | Sent | 3 May, 2009 | Angel Bay | |||
Pinnacle Ridge Route | VD ** | AltLd | Matthew | 2 May, 2009 | Craig Braich Ty Du (Pen yr... | ||
Easy Slab | V0+ * | Sent O/S | 13 Apr, 2009 | Porth Ysgo | |||
Area 2 Problem 41 | V1 * | Sent rpt | 13 Apr, 2009 | Porth Ysgo | |||
Sea Slab | f4 * | Sent O/S | 13 Apr, 2009 | Porth Ysgo | |||
Super Cheers | V0 * | Sent O/S | 13 Apr, 2009 | Porth Ysgo | |||
The Ysgo Flange | V2 ** | Solo O/S | Martin | 13 Apr, 2009 | Porth Ysgo | ||
Grooverider | f4 * | Sent β | 12 Apr, 2009 | Porth Ysgo | |||
Quarry Traverse | VB | Sent | Matt | 28 Sep, 2008 | Windgather Rocks | ||
Face Route 1 | HVD * | 2nd O/S | Matt | 28 Sep, 2008 | Windgather Rocks | ||
First's Arête | VD * | Lead O/S | Matt | 28 Sep, 2008 | Windgather Rocks | ||
Green Crack | S 4a ** | 2nd O/S | Matt | 28 Sep, 2008 | Windgather Rocks | ||
North Buttress Arête | S 4a * | Lead O/S | Matt | 28 Sep, 2008 | Windgather Rocks | ||
The Ramp / BB P15 | V1 * | Sent x | 20 Sep, 2008 | RAC Boulders | |||
RAC Arete Righthand / BB P13 | V0+ ** | Sent x | 20 Sep, 2008 | RAC Boulders | |||
RAC Arete Lefthand / BB P12 | V0 ** | Sent x | 20 Sep, 2008 | RAC Boulders | |||
Trouty | f5 ** | Sent x | 20 Sep, 2008 | Idwal Cottage Crag | |||
NWB P12 | f4+ ** | Sent x | 20 Sep, 2008 | Idwal Cottage Crag | |||
Idwal Crack | f5+ ** | Sent x | 20 Sep, 2008 | Idwal Cottage Crag | |||
Brown's Crack | f5 ** | Sent x | 20 Sep, 2008 | Cromlech boulders |