Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Dog | HVS 5b *** | TR | Paul | 17 Jul, 2010 | Pot Hole Quarry (Three... | ||
Blindfold | HS 4a | TR | Paul | 17 Jul, 2010 | Pot Hole Quarry (Three... | ||
Sunset | VD | TR | Paul | 17 Jul, 2010 | Pot Hole Quarry (Three... | ||
Mestre | S 4a | Lead | Paul | 17 Jul, 2010 | Pot Hole Quarry (Three... | ||
The Dog | HVS 5b *** | TR | Paul | 17 Jul, 2010 | Pot Hole Quarry (Three... | ||
South Buttress | D | Lead O/S | Lynne | 27 Jun, 2010 | Castle Naze | ||
Hodgkinson's Chimney | M | Lead O/S | Lynne | 27 Jun, 2010 | Castle Naze | ||
Mestre | S 4a | TR | Lynne | 22 Jun, 2010 | Pot Hole Quarry (Three... | ||
Sesto | HVD * | TR | Lynne | 22 Jun, 2010 | Pot Hole Quarry (Three... | ||
Selva | VS 4a | TR | Lynne | 22 Jun, 2010 | Pot Hole Quarry (Three... | ||
Marble Slab | HS 4b ** | Lead | Lynne | 19 Jun, 2010 | Clogwyn Bochlwyd | ||
Arete and Slab | VD * | Lead | Lynne | 19 Jun, 2010 | Clogwyn Bochlwyd | ||
Brown Slabs Face | HVD *** | Lead O/S | Lynne | 12 Jun, 2010 | Shepherd’s Crag | ||
Overhanging Arête | VD | Lead | Lynne | 5 Jun, 2010 | Windgather Rocks | ||
Left Triplet Crack | M | Lead | Lynne | 5 Jun, 2010 | Windgather Rocks | ||
South Buttress Crack | M * | Lead | Lynne | 5 Jun, 2010 | Windgather Rocks | ||
Senior's Ridge (Winter) | I/II 2 * | - | Lynne | 11 Apr, 2010 | Idwal Slabs (aka Cwm Idwal) | ||
The Staircase | M | Lead O/S | Lynne | 22 Aug, 2009 | Cadshaw Rocks | ||
Evening Ridge | S 4a | TR | Paul | 8 Aug, 2009 | Hobson Moor Quarry | ||
The Harp | HS 4b * | TR | Paul | 8 Aug, 2009 | Hobson Moor Quarry | ||
Boys Will Be Boys | VS 4c | TR | Paul | 8 Aug, 2009 | Hobson Moor Quarry | ||
Pocket Wall | VD * | Lead | Paul | 8 Aug, 2009 | Hobson Moor Quarry | ||
Pocket Wall | VD * | TR | 8 Aug, 2009 | Hobson Moor Quarry | |||
Pocket Wall | VD * | TR | 8 Aug, 2009 | Hobson Moor Quarry | |||
Tighe's Arête | E1 5a ** | TR | 8 Aug, 2009 | Hobson Moor Quarry |