Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Main wall traverse | V3 ** | Sent dnf | 21 May | Fraser Noble Building | |||
Outside Left | D | 2nd O/S | Jacob | 18 May | Clachnaben | ||
Sunset Rib | HS 4a | Lead dnf | Rory, Douglas, Aran | 18 May | Clachnaben | ||
Flakesville | S | 2nd O/S | Douglas | 18 May | Clachnaben | ||
Southeast Gully (Summer) | M | Solo O/S | 18 May | Clachnaben | |||
Python Cracks Direct Start | VD 4c | Lead O/S | Jacob, Aran | 18 May | Clachnaben | ||
The Lick | S | 2nd O/S | Douglas | 14 May | Meikle Partans | ||
Jug Wall | D * | Solo rpt | 14 May | Meikle Partans | |||
Curving Chimney | M | Solo rpt | 14 May | Meikle Partans | |||
Slanting Crack | M | Solo rpt | 14 May | Meikle Partans | |||
The Riff | VD | Lead rpt | Mia, Douglas | 14 May | Meikle Partans | ||
Verey Crack | HS 4b * | 2nd O/S | Douglas | 11 May | Vat Burn | ||
Crathes Crack | VS 4c *** | Lead O/S | Douglas | 11 May | Vat Burn | ||
Combo | S 4a ** | Lead O/S | Aran | 11 May | Vat Burn | ||
Pitmedden Arete | M * | Solo rpt | 11 May | Vat Burn | |||
Pitmedden Arete | M * | Solo O/S | 11 May | Vat Burn | |||
Fraser Crack | VD | Lead O/S | Rory, Aran | 11 May | Vat Burn | ||
Ring of Steall (Summer) | Grade-1 ** | Solo O/S | Mia | 4 May | Am Bodach | ||
Ledge Route | Grade-2 *** | Solo O/S | Mia | 3 May | Ben Nevis | ||
Wanderlust | VD *** | Lead O/S | Innesjack | 2 May | Polldubh Crags, Glen Nevis | ||
Aonach Eagach Ridge (Summer) | Grade-2 *** | Solo rpt | Mia | 1 May | Aonach Eagach - Sgorr nam... | ||
The Arete | f6A ** | Sent O/S | 30 Apr | Portlethen (Craigmaroinn) | |||
Kama Sutra | f4 * | Sent O/S | 30 Apr | Portlethen (Craigmaroinn) | |||
The Fault | f3 | Sent rpt | 30 Apr | Portlethen (Craigmaroinn) | |||
The Long Haul | f5 ** | Sent rpt | 30 Apr | Portlethen (Craigmaroinn) |