Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Sliding, Slithering, Squeezing (R17) | 5a | Lead | 2002 | The Pit | |||
Grey Slab (R16) | 5a | Lead | 2002 | The Pit | |||
Long Route (R15) | 5c | Lead | 2002 | The Pit | |||
Start Wet, Finish Dry (R13) | 5a | Lead | 2002 | The Pit | |||
Jani's Cave (R12) | 5a | Lead | 2002 | The Pit | |||
The Devil's Slip (R11) | 4c | Lead | 2002 | The Pit | |||
The Crinkle (R10) | 6a | Lead | 2002 | The Pit | |||
Fail Buttress (R9) | 6a | Lead | 2002 | The Pit | |||
September Crack (R8) | 5b | Lead | 2002 | The Pit | |||
Thomas's Original (R5) | 6a * | Lead | 2002 | The Pit | |||
Trying Buttress (R4) | 5b | Lead | 2002 | The Pit | |||
Pit Route (R3) | 4b | Lead | 2002 | The Pit | |||
Nope (R2) | 4a | Lead | 2002 | The Pit | |||
Easy Does It (R1) | 3a | Lead | 2002 | The Pit |