If you're building a multipitch belay using the 'direct isolation loop' technique that David Coley describes in his book, do you:
- tie the loop in one of the ropes, and build the belay with both ropes back to this?
- tie a separate loop in each rope and build the belay back to these (sounds awkward)?
- tie the loop as one knot using both ropes, and build the belay back to this (doesn't quite sound right)?
I'm struggling to find a reason why option #1 is bad, but I'm worried I might have missed something.
Post edited at 19:04