Hey,
I'm trying to get into TRS for the purpose of working steep, hard, single pitch, sport projects at my own pace. I've been looking into it online and in books, but honestly a lot of it is quite heavy and hard to understand, especially without diagrams and not being in person. I asked a friend of mine about his setup, and I thought I'd check it over with others here who may be more experienced.
- Figure 8 on a bight one end of my (dynamic) rope, and attach to equalised twin rings with sling.
- Abseil to base of route using Grigri
- At base, coil leftover rope and clove hitch to the end of the rope to provide weight, so that the rope feeds through my device
- Attach Grigri to my belay loop, pass the rope through it, and climb
- Tie overhand on a bight a few meters up to prevent ground fall if Grigri fails
- Upon reaching crux, tie another overhand on bight just for peace of mind. Then work crux
- When finished, lower self to base, untying knots as I go
How does this sound? Most other sources say to use traxions, but I can't really tell why other than for an extra backup in case of Grigri failure. I'd prefer to avoid buying expensive extra gear if possible (poor university student)
Thanks!