Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Gold Rush | E1 5b *** | Lead O/S | Eric | 28 May, 2006 | Auchinstarry Quarry | ||
Mussel Bound | HVS 5a ** | Lead O/S | John Maguire | 2 May, 2006 | Portobello | ||
Fiacaill Couloir | II *** | AltLd O/S | John Maguire | 2 Mar, 2006 | Cairn Gorm - Stob Coire an... | ||
Ramp Extension | f6A | Sent x | 10 Sep, 2005 | Portlethen (Craigmaroinn) | |||
The Ramp | f5+ | Sent O/S | 10 Sep, 2005 | Portlethen (Craigmaroinn) | |||
Secret Garden | f6A ** | Sent x | 10 Sep, 2005 | Portlethen (Craigmaroinn) | |||
Lighthouse Wall | HVS 5a * | Lead O/S | 4 Sep, 2005 | Crammag Head | |||
Heathy | VS 4c ** | Lead O/S | 21 Aug, 2005 | Rosyth Quarry | |||
Slab and Corner | S | Lead O/S | 20 Aug, 2005 | The Quadrocks | |||
Curving crack | VD ** | Lead O/S | 20 Aug, 2005 | The Quadrocks | |||
Mr Men | VS 4b ** | Solo O/S | 12 Aug, 2005 | Auchinstarry Quarry | |||
Traverse Face Direct | VS 4b ** | Lead O/S | 20 Jul, 2005 | The Quadrocks | |||
Promontory Direct | HVS 5a *** | Lead O/S | 15 May, 2005 | Auchinstarry Quarry | |||
Warmup Wall Low Traverse | f5 | Sent x | 20 Apr, 2005 | Dumbarton Rock | |||
Erewhon | f4+ *** | Sent O/S | 23 Mar, 2005 | Dumbarton Rock | |||
Crowberry Gully (Winter) | III 4 *** | AltLd O/S | John Maguire | 2 Mar, 2005 | Buachaille Etive Mor | ||
Eas Anie | IV 4 ** | AltLd O/S | Alastair | 27 Feb, 2005 | Beinn Chuirn | ||
Central Gully | I *** | Solo O/S | 27 Feb, 2005 | Ben Lui (Beinn Laoigh) | |||
Golden Oldy | II *** | AltLd O/S | John Maguire | 16 Feb, 2005 | Aonach Mor | ||
Tower Ridge | IV 3 *** | AltLd O/S | Colin Hastie | 6 Feb, 2005 | Ben Nevis | ||
Forgotten Twin | II ** | Solo | 27 Jan, 2005 | Aonach Mor | |||
Left Twin | III *** | AltLd O/S | Angus Murray | 23 Jan, 2005 | Aonach Mor | ||
PTO | f5 * | Sent O/S | 2005 | Dumbarton Rock | |||
Warmup Wall Low Traverse | f5 | Sent x | 2005 | Dumbarton Rock | |||
Ungava | f4+ | Sent O/S | 2005 | Dumbarton Rock |