Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Duvel 8.5% | f7A | Sent x | BobbyG | 17 May, 2010 | Shaftoe Crags | ||
Slapper | f7A | Sent x | BobbyG | 17 May, 2010 | Shaftoe Crags | ||
Aside | f6B | Sent x | 15 May, 2010 | Shaftoe Crags | |||
Sloper Masterclass | f5+ *** | Sent O/S | 15 May, 2010 | Shaftoe Crags | |||
Cuvier | f6A | Sent O/S | 15 May, 2010 | Shaftoe Crags | |||
Incipient Crack (sit start) | f7A *** | Sent x | 15 May, 2010 | Shaftoe Crags | |||
Bleaustard | f6A+ | Sent O/S | 15 May, 2010 | Shaftoe Crags | |||
Axe Head | f6A | Sent O/S | 15 May, 2010 | Shaftoe Crags | |||
Suprising Solution | f7A | Sent x | BobbyG | 11 May, 2010 | Shaftoe Crags | ||
The Neb Roof | f6C | Sent x | BobbyG | 11 May, 2010 | Shaftoe Crags | ||
Black and Tan | S 4c ** | Lead O/S | 9 May, 2010 | Bowden Doors | |||
Black and Tan Alternative Finish | HVS 5a | Lead O/S | 9 May, 2010 | Bowden Doors | |||
The Scoop | VS 4c ** | Lead O/S | 9 May, 2010 | Bowden Doors | |||
Grovel Groove | S 4a ** | Lead O/S | 9 May, 2010 | Bowden Doors | |||
First Leaning Groove | HVS 5a ** | Lead O/S | 9 May, 2010 | Bowden Doors | |||
Canada Dry | VS 5a | Solo O/S | 4 May, 2010 | Bowden Doors | |||
The Lightbulb | f6A ** | Sent O/S | 4 May, 2010 | Bowden Doors | |||
Transformer | f6A+ * | Sent O/S | 4 May, 2010 | Bowden Doors | |||
Family Pressure | E1 5c * | Solo | 4 May, 2010 | Bowden Doors | |||
The Shiner | f5 | Solo | 4 May, 2010 | Bowden Doors | |||
Bloody Nose | HS 5a * | Solo | 4 May, 2010 | Bowden Doors | |||
The Face | f4 | Sent O/S | 3 May, 2010 | Potts Buttress (Simonside) | |||
Bold Slab | f5+ | Sent O/S | 3 May, 2010 | Potts Buttress (Simonside) | |||
Monty Python's Direct | f6C+ ** | Sent x | May, 2010 | Kyloe-in-the-woods (Kyloe-In) | |||
Badfinger SS | f6B * | Sent x | May, 2010 | Kyloe-in-the-woods (Kyloe-In) |