showing 1-25
UKH
Name Grade Style Date Crag name
Main Wall HS 4b *** Lead 21 Sep Crag Lough
Tarzan S 4a *** 2nd rpt 21 Sep Crag Lough
Hadrian's Buttress HS 4b *** Lead 21 Sep Crag Lough
Face Route S 4a Lead 21 Sep Crag Lough
Wall and Crack D 2nd O/S 21 Sep Crag Lough
West Corner S 4a Lead 21 Sep Crag Lough
Tiger's Overhang VS 4c ** Lead rpt 16 Jul Peel crag
Overhanging Crack VS 4c *** - 16 Jul Peel crag
Grog S Lead rpt 16 Jul Peel crag
Sunset S 4a *** 2nd rpt 16 Jul Peel crag
Twin Cracks VS 5a * TR rpt 16 Jul Peel crag
Route One VD 2nd rpt 16 Jul Peel crag
Tophet Wall HS 4b *** AltLd O/S 14 Jul The Napes
Overhanging Crack VS 4c *** Lead rpt 22 Jun Peel crag
Sunset S 4a *** Lead rpt 22 Jun Peel crag
Tarzan S 4a *** 2nd 22 Jun Crag Lough
Hadrian's Buttress HS 4b *** 2nd 22 Jun Crag Lough
Jacob's Ladder VD ** Lead 22 Jun Great Wanney
Main Wall S 4a ** 2nd O/S 22 Jun Great Wanney
Boundary Corner VD *** Lead 22 Jun Great Wanney
Triple Cracks HS 4c * Lead rpt 25 May Bowden Doors
Jackdaw Crack HVS 5b * TR 25 May Bowden Doors
Handrail VS 4c Lead 25 May Bowden Doors
The Scoop VS 4c ** Lead 25 May Bowden Doors
Nose Chimney VD Lead O/S 14 May Great Wanney