Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Coffin Corner | HVS 5a ** | 2nd dog | Dave Stocks | 8 Aug | Dunkeld, Cave Crag | ||
Death's Head | E1 5b ** | 2nd dog | Dave Stocks | 8 Aug | Dunkeld, Cave Crag | ||
Fluke | S 4a | Lead | Dave Stocks | 8 Aug | Dunkeld, Cave Crag | ||
Crutch | S ** | Lead | Dave Stocks | 8 Aug | Dunkeld, Cave Crag | ||
Sou'wester Slabs | VD *** | Lead rpt | 28 Jul | Cir Mhor | |||
Slinky Lizard | HS 4b * | Lead rpt | 25 Jul | Auchinstarry Quarry | |||
Trundle | VS 4c ** | Lead rpt | 25 Jul | Auchinstarry Quarry | |||
Recess Route (Summer) | S *** | AltLd | 23 Jul | The Cobbler | |||
Right-Angled Gully Direct (Summer) | S | AltLd | 23 Jul | The Cobbler | |||
The Lilly | S ** | Lead rpt | 16 Jul | Hawkcraig | |||
Pain Pillar | VS 4c *** | Lead rpt | 16 Jul | Hawkcraig | |||
Fish Head Arete | VD * | Lead rpt | 16 Jul | Hawkcraig | |||
Ugh! | HS * | Lead rpt | 16 Jul | Hawkcraig | |||
Mister, Ye Can Walk Up Roon The Back | S | TR rpt | 13 Jul | Auchinstarry Quarry | |||
Green Onion | HVS 5b | Lead rpt | lynx0907 | 13 Jul | Auchinstarry Quarry | ||
Promontory Direct | HVS 5a *** | Lead rpt | lynx0907 | 13 Jul | Auchinstarry Quarry | ||
Knock Back | E1 5b ** | Lead rpt | lynx0907 | 13 Jul | Auchinstarry Quarry | ||
Strawberry Crack | S ** | Lead | 9 Jul | Neilston Quarry | |||
Willie's Route | S ** | Lead | 9 Jul | Neilston Quarry | |||
Curving Crack | HVS 5a * | Lead | 9 Jul | Neilston Quarry | |||
Crack Corner | VD * | Lead | 9 Jul | Neilston Quarry | |||
Stephen Slab | HS * | Lead | 9 Jul | Neilston Quarry | |||
South Ridge Direct | VS 5a *** | AltLd rpt | Dave Stocks | 16 Jun | Cir Mhor | ||
White Slab | HS 4b ** | Lead rpt | 12 Jun | Auchinstarry Quarry | |||
Spirogyra | VS 4c ** | Lead rpt | 12 Jun | Auchinstarry Quarry |