showing 1-25
UKH
Name Grade Style Date Crag name
Ridsdale Wall E1 5b ** Lead dog 11 Aug, 2018 East Woodburn
Foxey VS 4c 2nd rpt 11 Aug, 2018 East Woodburn
Woodburn Wall E1 5b ** TR rpt 11 Aug, 2018 East Woodburn
The Arete HS 4b * 2nd rpt 11 Aug, 2018 East Woodburn
Overhanging Heave S 4c Lead O/S 11 Aug, 2018 East Woodburn
Deception Crack HS 4b ** Lead dnf 4 Aug, 2018 Kyloe Crag (Kyloe Out)
Christmas Tree Arete (Direct Finish) VS 4c Lead rpt 4 Aug, 2018 Kyloe Crag (Kyloe Out)
Flake Crack S 4b *** 2nd rpt 4 Aug, 2018 Kyloe Crag (Kyloe Out)
Mo S 4a 2nd rpt 4 Aug, 2018 Kyloe Crag (Kyloe Out)
Jackdaw Ridge Direct VD ** Lead rpt 21 Jul, 2018 Shepherd’s Crag
Brown Slabs D ** TR rpt 21 Jul, 2018 Shepherd’s Crag
Brown Slabs Arete D *** Lead rpt 21 Jul, 2018 Shepherd’s Crag
Main Wall (Variation Start) MS 2nd rpt 19 Jul, 2018 Great Wanney
Jacob's Ladder VD ** 2nd rpt 19 Jul, 2018 Great Wanney
Rake's Arête VD * Lead O/S 19 Jul, 2018 Great Wanney
Grooves HS 4a ** Lead rpt 14 Jul, 2018 Peel crag
Apollo MS 2nd O/S 14 Jul, 2018 Peel crag
Overhanging Crack VS 4c *** Lead O/S 14 Jul, 2018 Peel crag
Jackdaw Ridge Direct VD ** Lead 7 Jul, 2018 Shepherd’s Crag
Little Chamonix VD *** Lead rpt 7 Jul, 2018 Shepherd’s Crag
Brown Slabs Arete D *** 2nd rpt 7 Jul, 2018 Shepherd’s Crag
Sunset S 4a *** Lead rpt 30 Jun, 2018 Peel crag
Chockstone Chimney D * Lead rpt 30 Jun, 2018 Peel crag
Tiger's Wall HVS 5a *** 2nd rpt 8 Apr, 2017 Bowden Doors
Black and Tan Alternative Finish HVS 5a 2nd rpt 8 Apr, 2017 Bowden Doors