Just built a new shed for bike pottering and general man caving duties, problem is it’s full of sh*t from the old shed.
Solution = build a hut for shed sh*t so comfy chair and optic, I mean work bench and stuff and things can be added to new shed.
I’ve got some old heavy (50KG or so) slabs that were recently lifted from around the house. These were not cemented in, only laid on ash & then sand – they were flush and hadn’t moved since the day they were put down (many years before my time here).
So… my slab area is going to be about 4m2 which would be about 0.5 tonne of type 1 and 0.5 of sand. Problem is can’t find anyone locally that will do a half tonne.
So would it be OK to just get a tonne of sand and use just sand?
The slabs won’t be walked on, they will just have this hut on them, also I have no whacker – will stamping in the sub base be good enough? Never done any slabs before…
cheers