In reply to goodboy:
Perhaps it could be the location of the autos that causes the problem then? (If so, why put them there?!?)
Making some grand assumptions on how long it takes to climb a route:
Lead: (tie in, set belayer, climb, clip draws, clip lower off, untie and strip rope) = 5 mins?
Top rope: (tie in, set belayer, climb, lower, untie) = 3.5 mins?
autobelay: (clip in, climb, lower, unclip) = 2 mins
Based on the above, surely autobelays make the most efficient use of a wall if you're purely interested in having lots of routes available to your customers?
I'll confess to still being baffled by the logic of this particular wall!
mike.
Post edited at 14:44