Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Great Buttress | HVS 5a *** | 2nd | 3 Sep, 2010 | Dovestone Tor | |||
Barney Rubble | VS 4c ** | Lead | 3 Sep, 2010 | Dovestone Tor | |||
Gargoyle Traverse | S 4a * | Lead | 3 Sep, 2010 | Dovestone Tor | |||
Chequers Buttress | HVS 5a *** | 2nd | 20 Aug, 2010 | Froggatt Edge | |||
Le Crepuscule | VS 5b ** | Lead | 15 Aug, 2010 | Rheinstor | |||
Atropine | VS 4b ** | Lead | 11 Aug, 2010 | Castle Naze | |||
No Name | S 4b | Lead | 11 Aug, 2010 | Castle Naze | |||
Combs Climb | S 4a * | Lead | 11 Aug, 2010 | Castle Naze | |||
Sheltered Crack | VD * | 2nd | 11 Aug, 2010 | Castle Naze | |||
Struggle | VS 4c | Solo | 8 Aug, 2010 | Windgather Rocks | |||
Mississippi Crack | S 4a ** | Solo | 8 Aug, 2010 | Windgather Rocks | |||
Small Wall | S 4b | Solo | 8 Aug, 2010 | Windgather Rocks | |||
Green Crack | S 4a ** | Solo | 8 Aug, 2010 | Windgather Rocks | |||
Black Slab | S 4a * | Solo | 8 Aug, 2010 | Windgather Rocks | |||
Muscle Crack | S 4a | Solo | 4 Jul, 2010 | Castle Naze | |||
Keep Corner | S 4a * | Solo | 4 Jul, 2010 | Castle Naze | |||
Footstool Right | HVD 4a * | Solo | 4 Jul, 2010 | Castle Naze | |||
The Nithin | S 4a * | Lead | 4 Jul, 2010 | Castle Naze | |||
The Niche | S 4a ** | Lead | 4 Jul, 2010 | Castle Naze | |||
Heather Face | HVD | Lead | 28 Jun, 2010 | Windgather Rocks | |||
Traditional | HS 4a * | Lead | 28 Jun, 2010 | Windgather Rocks | |||
Side Face | HVD 3c | Solo | 28 Jun, 2010 | Windgather Rocks | |||
Rum and Pep | HVD 4a | 2nd | 28 Jun, 2010 | Baslow Edge | |||
Shandy | D | Lead | 28 Jun, 2010 | Baslow Edge | |||
Route 1.9 | S 4a | Solo | 28 Jun, 2010 | Baslow Edge |