Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Goat’s Slab | VD * | Solo O/S | 24 Feb, 2013 | Goat’s Crag | |||
Far Flung | VD | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Wart | VD * | 2nd O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Triplanetary | HS 4b | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Thrutch | VD | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
The Verger | VD | Solo O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
The Mushroom | D | Solo O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
The Morning After | VS 4c * | 2nd O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Lone Tree Variation | S 4b * | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Lone Tree Groove | S 4a * | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Inspired | S 4b | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Fine White Line | VS 4c * | Lead O/S | Gary H | 19 Feb, 2013 | Warton Pinnacle Crag | ||
Armchair Variant | HS 4c | Lead O/S | MollyAnne | 18 Feb, 2013 | Hoad Slabs | ||
Railway | HS 4a | Lead O/S | MollyAnne | 18 Feb, 2013 | Hoad Slabs | ||
Hoad Road | HVS 5a | Lead O/S | MollyAnne | 18 Feb, 2013 | Hoad Slabs | ||
Route 1 | HS 4b * | Solo O/S | john lynch | 27 Jan, 2013 | Burbage North | ||
Route 2 | S 4a * | Solo O/S | john lynch | 27 Jan, 2013 | Burbage North | ||
Route 3 | VD 4a * | Solo O/S | john lynch | 27 Jan, 2013 | Burbage North | ||
Grim Wall | VS 4c ** | AltLd | climb the peak | 2013 | Craig Bwlch y Moch (Tremadog) | ||
Cracked Slab | D ** | Lead | climb the peak | 2013 | Craig Bwlch y Moch (Tremadog) | ||
Buck Cover | VD | 2nd O/S | 29 Nov, 2012 | Upper Buck Crag Slab | |||
Exersize Buck | MVS 4b * | 2nd O/S | 29 Nov, 2012 | Upper Buck Crag Slab | |||
Buck Review | MVS 4b | 2nd O/S | 29 Nov, 2012 | Upper Buck Crag Slab | |||
Open Buck | VD | Lead O/S | 29 Nov, 2012 | Upper Buck Crag Slab | |||
Black Bucks | VD | Lead O/S | 29 Nov, 2012 | Upper Buck Crag Slab |