Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Main Gully | Grade-2 ** | - | 13 Oct, 2012 | Glyder Fach | |||
Fossible | HS 4c * | 2nd RP | 26 Sep, 2012 | Avon Gorge (Suspension Bridge... | |||
Aged Crack | S 4a * | Lead O/S | 22 Sep, 2012 | Windgather Rocks | |||
Bulging Arête | S 4a | Lead β | 22 Sep, 2012 | Windgather Rocks | |||
Face Route 1 | HVD * | 2nd O/S | 22 Sep, 2012 | Windgather Rocks | |||
High Buttress Arête | D *** | Lead O/S | 22 Sep, 2012 | Windgather Rocks | |||
Middle Triplet Crack | S 3c | Lead O/S | 22 Sep, 2012 | Windgather Rocks | |||
Nose Direct | HVD ** | - | 22 Sep, 2012 | Windgather Rocks | |||
Rib and Slab | M | Solo O/S | 22 Sep, 2012 | Windgather Rocks | |||
The Rib Right-hand | HVD 4a | Lead O/S | 22 Sep, 2012 | Windgather Rocks | |||
Temple Crack | HVD 4a * | 2nd β | 20 Sep, 2012 | Rivelin Edge | |||
Right Holly Pillar Crack | S 4a * | 2nd β | 20 Sep, 2012 | Rivelin Edge | |||
Gunner's Groove | D | 2nd O/S | 16 Sep, 2012 | Birchen Edge | |||
Seasick Slab | f3+ * | TR β | 16 Sep, 2012 | Birchen Edge | |||
Tar's Crack | VD * | Lead O/S | 16 Sep, 2012 | Birchen Edge | |||
Torpedo Tube | HVD 4a * | Lead O/S | 16 Sep, 2012 | Birchen Edge | |||
Face Route 1 | HVD * | Lead O/S | 15 Sep, 2012 | Windgather Rocks | |||
Face Route 2 | D | Lead O/S | 15 Sep, 2012 | Windgather Rocks | |||
Right Triplet Crack | S 4a | 2nd β | 15 Sep, 2012 | Windgather Rocks | |||
Side Face | HVD 3c | 2nd O/S | 15 Sep, 2012 | Windgather Rocks | |||
Yo-Ho Crack | VD * | Lead O/S | 10 Sep, 2012 | Birchen Edge | |||
Sailor's Problem | VD | Lead O/S | 10 Sep, 2012 | Birchen Edge | |||
Sheetbend | S 4b | Lead O/S | 10 Sep, 2012 | Birchen Edge | |||
Black Slab | S 4a * | 2nd O/S | 8 Sep, 2012 | Windgather Rocks | |||
Wall Climb | HVD * | 2nd O/S | 8 Sep, 2012 | Windgather Rocks |