Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Overlapping Wall | S 4a | Lead O/S | with Stu | 2 Apr, 2021 | Windgather Rocks | ||
South Buttress Crack | M * | Solo | with Stu | 2 Apr, 2021 | Windgather Rocks | ||
Discontinuous Rib and Groove | M | Solo | with Stu | 2 Apr, 2021 | Windgather Rocks | ||
The Arete | VD ** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
Lazarus | S 4a *** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
Hope | VD *** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
The Arete | VD ** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
Lazarus | S 4a *** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
Hope | VD *** | AltLd | with Stu | 19 Sep, 2020 | Idwal Slabs (aka Cwm Idwal) | ||
Monster Slap | f5 | Sent | 1 Sep, 2020 | St. Bees Head | |||
Problem 3 - Missing Corner Block | f6A+ | Sent | 1 Sep, 2020 | St. Bees Head | |||
The Scoop | f5+ | Sent | 1 Sep, 2020 | St. Bees Head | |||
Shot Hole Wall | V0 | Sent x | 1 Sep, 2020 | St. Bees Head | |||
Kamikaze Caterpillar | f6B | Sent x | 1 Sep, 2020 | St. Bees Head | |||
Dedfer | HS 4c | 2nd | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
Annual Route | HS 4b * | Lead | 12 Jul, 2020 | Pule Hill Rocks | |||
Geoff's Groove | D | 2nd | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
Retreat | M | Solo | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
The Iliad | VS 5a | Lead dnf | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
Skull Climb Right-hand | S 4a | Lead | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
Skull Climb | VD * | Lead | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
No Exit | VS 4c * | Lead | with Stu | 12 Jul, 2020 | Pule Hill Rocks | ||
Little Nose | f4 | AltLd O/S | with Stu | 30 Oct, 2019 | Woodhouse Scar | ||
Jam Mantel | f4 | AltLd O/S | with Stu | 30 Oct, 2019 | Woodhouse Scar | ||
Thin Crack | f5+ | AltLd O/S | with Stu | 30 Oct, 2019 | Woodhouse Scar |