Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Slab Climb | HS 4a * | AltLd rpt | 17 Apr | Castle Rock of Triermain | |||
Wall Climb | HS 4a * | AltLd rpt | 17 Apr | Castle Rock of Triermain | |||
Direct Route | VS 4b *** | Lead rpt | 17 Apr | Castle Rock of Triermain | |||
Via Media | S 4a ** | AltLd rpt | 17 Apr | Castle Rock of Triermain | |||
Pithecanthropus Erectus | HS 4b * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
Gorilla Berengii | HS 4c * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
The Lemur's Tail | VS 4c * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
Serpent | S 4a * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
Pegasus | VS 5a * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
The Rib | HS 4b * | AltLd rpt | 16 Apr | Hutton Roof Crags | |||
Slip Knot | VS 4b *** | AltLd rpt | Ashley | 31 Mar | White Ghyll | ||
The Gordian Knot | VS 4c *** | AltLd rpt | Ashley | 31 Mar | White Ghyll | ||
White Ghyll Wall | VS 4c *** | AltLd rpt | Ashley | 31 Mar | White Ghyll | ||
Morocco Coco | VS 4c *** | Lead O/S | 21 Mar | Ksar Rock | |||
Iron Maiden | HVS 5b ** | 2nd O/S | 21 Mar | Ksar Rock | |||
Bridge over the river Kasbah | VS 4c * | Lead O/S | 20 Mar | Griffon Rock | |||
The Rainmaker | E1 | 2nd | 20 Mar | Griffon Rock | |||
Crackerjack | E3 *** | 2nd dnf | 20 Mar | Griffon Rock | |||
Vertigone | HVS 5b | Lead O/S | 19 Mar | Azumer Crag | |||
Vertigo | E2 5b | TR O/S | 19 Mar | Azumer Crag | |||
Be Prepared | VS | Lead O/S | 19 Mar | Azumer Crag | |||
Azumer Groove | VS 4b ** | Lead O/S | 19 Mar | Azumer Crag | |||
Razzle Dazzle | VS 4c *** | Lead O/S | 19 Mar | Azumer Crag | |||
Firesword | E1 *** | AltLd O/S | Bernard | 18 Mar | Dragon Buttress | ||
Brisingr | HVS *** | AltLd O/S | 17 Mar | Dragon Buttress |