UKC

Wishlist for Prbirdo

View Wishlist entries on a map
showing 1-25
Climb name Grade Added Crag name
Second Honeymoon7a 28 AugWater-cum-Jolly
ZigzagD *11 MayWindgather Rocks
Middle Buttress ArêteVD *11 MayWindgather Rocks
Centre RouteS 4a *11 MayWindgather Rocks
The Slant StartHVD *11 MayWindgather Rocks
Leg StumpD *10 MayWindgather Rocks
CheekVS 5a *8 MayWindgather Rocks
The RibVS 5a *8 MayWindgather Rocks
Right Triplet CrackS 4a 4 MayWindgather Rocks
Route 2VS 4b 4 MayWindgather Rocks
Editor's NoteVS 5a *4 MayWindgather Rocks
Leg UpVS 5a 4 MayWindgather Rocks
TraditionalHS 4a *4 MayWindgather Rocks
FootprintVD *3 MayWindgather Rocks
Huggyf5 **25 FebBurbage South...
Triangle Wallf7A+ ***23 JanBurbage South Edge
Aged CrackS 4a *13 Dec, 2024Windgather Rocks
North Buttress ArêteS 4a *8 Nov, 2024Windgather Rocks
NozagVS 4c ***8 Nov, 2024Castle Naze
South Buttress Arête DirectE1 5b 5 Nov, 2024Windgather Rocks
Green SlabS 4b *18 Oct, 2024Windgather Rocks
Nose DirectHVD **18 Oct, 2024Windgather Rocks
DirectorVS 4b *18 Oct, 2024Windgather Rocks
Broken GrooveD *18 Oct, 2024Windgather Rocks
Bulging ArêteS 4a 18 Oct, 2024Windgather Rocks
Loading Notifications...