showing 1-25
UKH
Name Grade Style Date Crag name
First Stop 5a * 2nd 14 Sep, 2013 Bus Stop Quarry
Biggles Flies Undone E1 5b * 2nd 14 Sep, 2013 Bus Stop Quarry
Mini Bus Stop 6a 2nd 14 Sep, 2013 Bus Stop Quarry
Comfort Zone 5a * 2nd 14 Sep, 2013 Bus Stop Quarry
Septuagenarian 6a * 2nd 14 Sep, 2013 Bus Stop Quarry
Chimney Crack M * AltLd 6 Jul, 2013 Tryfan Fach (Little Tryfan)
Crack 2 D * AltLd 6 Jul, 2013 Tryfan Fach (Little Tryfan)
Pine Martin f4+ ** Sent 9 Sep, 2012 Roaches Lower Tier
Chips and Flake f6A Sent 9 Sep, 2012 Roaches Lower Tier
Slabby Arête f3+ * Sent 9 Sep, 2012 Roaches Lower Tier
Something Better Change E2 5b * TR 9 Sep, 2012 Roaches Lower Tier
Captain Lethargy HVD Lead O/S 9 Sep, 2012 Roaches Lower Tier
Pink Wall f5 * Sent 8 Sep, 2012 Roaches Upper Tier
Runnel Arête f2+ * Sent 8 Sep, 2012 Roaches Lower Tier
The Staircase f5+ * Sent 8 Sep, 2012 Roaches Upper Tier
Back Slab Right f3+ * Sent 8 Sep, 2012 Roaches Lower Tier
Blister Slab f4+ ** Sent 8 Sep, 2012 Roaches Lower Tier
Flake Arête f4 ** Sent 8 Sep, 2012 Roaches Lower Tier
Classic Arête f4 ** Sent 8 Sep, 2012 Roaches Lower Tier
Boss Slab f4+ * Sent 8 Sep, 2012 Roaches Lower Tier
Joe's Portholes f4+ * Sent 8 Sep, 2012 Roaches Upper Tier
Bog Slab f4 * Sent 8 Sep, 2012 Roaches Lower Tier
Pine Slab f5+ ** Sent 8 Sep, 2012 Roaches Lower Tier
Squeezy Slab f5 ** Sent 8 Sep, 2012 Roaches Lower Tier
Rotunda Gully M Lead O/S 8 Sep, 2012 Roaches Upper Tier