Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Poacher | VS 4b ** | 2nd O/S | John Eccles | 6 Jan, 2013 | Logie Head | ||
Left Rib | S 4a * | Lead O/S | 2013 | Huntly's Cave | |||
Doddle Diedre | S * | Lead O/S | 2013 | Cummingston | |||
Blockproof | S | Lead O/S | 2013 | Cummingston | |||
The Groove | D | Lead O/S | 2013 | Cummingston | |||
Staircase Crack | S | Lead O/S | 2013 | Cummingston | |||
Hidden Chimney | III ** | AltLd O/S | Dan Pinkney | 29 Dec, 2012 | Cairn Gorm - Stob Coire an... | ||
Stoker's Wall | D * | Lead O/S | theycallmefrodo | 23 Sep, 2012 | Birchen Edge | ||
Stoker's Hole | HS 4a * | 2nd O/S | Dan Pinkney | 23 Sep, 2012 | Birchen Edge | ||
Nautical Crack | VD * | Lead O/S | theycallmefrodo | 23 Sep, 2012 | Birchen Edge | ||
Reef Knot | S 4b * | Lead O/S | theycallmefrodo | 23 Sep, 2012 | Birchen Edge | ||
Whatknot? | S 4b * | Lead O/S | theycallmefrodo | 23 Sep, 2012 | Birchen Edge | ||
Topsail | VS 4c ** | 2nd O/S | Dan Pinkney | 23 Sep, 2012 | Birchen Edge | ||
Sail Buttress | HS 4b ** | Lead O/S | Dan Pinkney | 23 Sep, 2012 | Birchen Edge | ||
Bow-Shaped Wall | VS 5a | 2nd O/S | 22 Sep, 2012 | Harborough Rocks | |||
Introductory Wall | D | Lead O/S | 22 Sep, 2012 | Harborough Rocks | |||
Steeple Arete | VD * | Lead O/S | 22 Sep, 2012 | Harborough Rocks | |||
Concave Wall | HVD 4a * | 2nd O/S | 22 Sep, 2012 | Harborough Rocks | |||
Overhanging Wall Variant | VD ** | Lead O/S | 22 Sep, 2012 | Harborough Rocks | |||
Little Gully | D | Lead O/S | 22 Sep, 2012 | Harborough Rocks | |||
Bow Arete | D | Lead O/S | 22 Sep, 2012 | Harborough Rocks | |||
Caravanserai | HVS 5a | 2nd O/S | Dan Pinkney | 26 Aug, 2012 | Compass Point (Bude) | ||
Crazy Paving | E1 5a | 2nd O/S | Dan Pinkney | 26 Aug, 2012 | Vicarage Cliff | ||
Wellington's Stand | VS 5a * | 2nd O/S | Dan Pinkney | 26 Aug, 2012 | Vicarage Cliff | ||
Pandora | VS 4b ** | 2nd O/S | Dan Pinkney | 26 Aug, 2012 | Vicarage Cliff |