Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Alaskan Thunderfuck | f6A | Sent x | Joeyclimbing, Jason | 24 Mar | Manju's Place | ||
Ofidos | f6A | Sent x | Jray | 22 Mar | Alcañiz | ||
Working Plan | f6B | Sent x | Jason | 22 Mar | Alcañiz | ||
Minigruyere (ARR-B26-L3) | f6A | Sent rpt | Jason | 20 Mar | Arrastradero | ||
Muro de sonido | f6A | Sent x | Jray | 19 Mar | La Fuente | ||
El juglar (CAB-B2-L1) | f6A+ | Sent β | Jason | 19 Mar | Cabrerizo | ||
Populus (CAB-B2) | f5+ | Sent x | Jray | 19 Mar | Cabrerizo | ||
Notch Arete | Grade-3 *** | Solo rpt | Jason | 10 Mar | Tryfan | ||
Wrinkled Tower (a.k.a. Wrinkled Ridge) | M *** | 2nd O/S | Jray | 10 Mar | Tryfan | ||
Rob da bank | V2 | Sent β | Jason | 4 Mar | The Ogwen bank boulder | ||
Spider Crack | V0+ | Sent β | Jason | 4 Mar | The Ogwen bank boulder | ||
The missing line | V3 | Sent x | Jason | 4 Mar | The Ogwen bank boulder | ||
Boss Slab | f4+ * | Sent β | Jason | 2 Mar | Roaches Lower Tier | ||
Ash Tree Crack | VD * | Lead O/S | Jray | 2 Mar | Burbage North | ||
Bilberry Crack | VD * | 2nd β | Jray | 2 Mar | Burbage North | ||
Ash Tree Wall | S 4a ** | 2nd β | Jray | 2 Mar | Burbage North | ||
Mini Crack | f4+ * | Sent x | Jray | 1 Mar | Curbar Edge | ||
Mini-Arête | f4 * | Sent x | Jray | 1 Mar | Curbar Edge | ||
Crackside | f6A * | Sent x | Jray | 1 Mar | Curbar Edge | ||
Side-wall Slot with Arête | f5+ * | Sent x | Jray | 1 Mar | Curbar Edge | ||
Joel's Hole | f5 * | Sent β | Jray | 1 Mar | Curbar Edge | ||
Bore-hole Traverse | f5 * | Sent x | Jray | 1 Mar | Curbar Edge | ||
Bore-hole Crack | f3+ | Sent β | Jray | 1 Mar | Curbar Edge | ||
Bore-hole Wall | f3+ | Sent β | Jray | 1 Mar | Curbar Edge | ||
Block and Crack | f2 | Sent β | Jray | 28 Feb | Roaches Lower Tier |