Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
The Mantel Piece | f4+ * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Quick Step | f5 * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Stairway | f5+ * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Ripples | f6A *** | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Amoeba State | f5+ * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Stopcock | f4+ * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Fountain of Youth | f5+ *** | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Taming the Flow | f6B ** | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Papoose | f6A * | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Totem Pole | f4+ ** | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Little Bear | f4+ | Sent O/S | 1 Sep, 2008 | Neddyfields | |||
Oblivion is Forever | 6b * | Lead O/S | steve | 30 Aug, 2008 | Blacknor South | ||
Talk | 6a+ ** | Lead O/S | steve | 30 Aug, 2008 | Blacknor South | ||
Fallen Slab Arête | 3a *** | Lead rpt | steve | 30 Aug, 2008 | Blacknor Beach | ||
Losing My Sad Tomato | 6b+ ** | Lead rpt | steve | 30 Aug, 2008 | Blacknor Beach | ||
Six Good Biceps | 4c ** | Lead rpt | steve | 30 Aug, 2008 | Blacknor Beach | ||
It's My Life | 5a * | Lead rpt | steve | 30 Aug, 2008 | Blacknor South | ||
Imperfect | 3c * | Lead rpt | steve | 30 Aug, 2008 | Blacknor South | ||
Do Ixtlan | 5b * | Lead rpt | steve | 30 Aug, 2008 | Blacknor South | ||
Well Done Poppet | 5c * | Lead rpt | steve | 30 Aug, 2008 | Blacknor South | ||
Launching Pad | E1 5b * | 2nd O/S | Matt, Rich | 24 Aug, 2008 | Dali's Hole | ||
La Gendre | 6a+ | Lead O/S | Matt, Rich | 24 Aug, 2008 | Dali's Hole | ||
Pull My Daisy | E2 5c *** | 2nd O/S | Matt, Rich | 24 Aug, 2008 | Rainbow Slab Area | ||
The Horsin' Around Finish | 6a+ ** | Lead O/S | Matt, Rich | 24 Aug, 2008 | Rainbow Slab Area | ||
Cemetery Gates | E1 5b *** | 2nd O/S | Matt, Rich | 23 Aug, 2008 | Dinas Cromlech |