Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Tower Arete | S 4a | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
Tower Wall | VS 4c | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
Mabon | S 4b ** | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
Epona | S 4a * | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
The Shield | S 4a | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
The Sword | S 4a | Solo O/S | 8 Jul, 2012 | Fairy Steps | |||
Django | VD | Solo | Dave | 4 Jul, 2012 | Twistleton Scars | ||
Route 2 | HS 4b *** | AltLd O/S | Ben | 26 Jun, 2012 | Raven Crag (Walthwaite) | ||
Hardup Wall | VS 4b * | 2nd O/S | Ben | 26 Jun, 2012 | Raven Crag (Walthwaite) | ||
Route 1 | S 4a * | Lead O/S | Ben | 26 Jun, 2012 | Raven Crag (Walthwaite) | ||
Rock Ivy Line | VD | 2nd | Angus | 15 Jun, 2012 | Farleton Crag | ||
Enyoka | HVS 5b | 2nd | Angus | 15 Jun, 2012 | Farleton Crag | ||
Lumumba | HS 4a | Lead | Angus | 15 Jun, 2012 | Farleton Crag | ||
Route 1 | VD *** | AltLd | tim | 27 May, 2012 | Scout Crags | ||
Route 2 | VD ** | AltLd | tim | 27 May, 2012 | Scout Crags | ||
Curving | VD | Solo | 25 May, 2012 | Hutton Roof Crags | |||
The Runnel | D | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Spike Route | VD | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Third Wall Central | VD | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Pedestal Crack | D | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Second Wall | VD * | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Smooth Rib | S 4a * | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Crackling | D * | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Concave Wall | VD | Solo | 25 May, 2012 | Hutton Roof Crags | |||
Ash Tree Slab | VD | Solo | 25 May, 2012 | Hutton Roof Crags |