Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Imperfect | 3c * | Lead O/S | Tris.west | 31 Jul, 2010 | Blacknor South | ||
Do Ixtlan | 5b * | Lead O/S | Tris.west | 31 Jul, 2010 | Blacknor South | ||
Slings Shot | 5a *** | Lead β | Tris.west | 30 Jul, 2010 | Blacknor North | ||
Big Budget Productions | 6a * | Lead β | Tris.west | 5 Jul, 2010 | Cheddar Gorge North | ||
Mr Ripple | 6a * | Lead | Tris.west | 5 Jul, 2010 | Cheddar Gorge North | ||
The Horn | f5 *** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
Overhanging Scoop | f5 ** | Sent O/S | 3 Jul, 2010 | Bonehill Rocks | |||
Cracked Boulder | f3+ * | Sent O/S | 3 Jul, 2010 | Bonehill Rocks | |||
Little Prow Traverse | f6C ** | Sent x | 3 Jul, 2010 | Hound Tor | |||
Sloper Wall | f4+ ** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
45 Degree Roof Low | f6B+ * | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
45 Degree Roof | f5+ ** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
Prowed Arête | f5 ** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
Narrow Face | f4+ ** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
Left Side of Right Arête (Javu P64) | f4+ | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
West Side Wall Sitter | f6B ** | Sent β | 3 Jul, 2010 | Hound Tor | |||
West Side Wall | f4 * | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
West Arête | f4+ ** | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
West Wall Left | f4 | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
West Wall | f3+ * | Sent O/S | 3 Jul, 2010 | Hound Tor | |||
Three Pounds Per Tonne | 4a | Lead O/S | Tris.west | 29 Jun, 2010 | Cheddar Gorge North | ||
Oh Pretty Woman! | 5c | Lead | Tris.west | 29 Jun, 2010 | Cheddar Gorge North | ||
Jurassic Slab | f3 * | Sent O/S | Tris.west | 27 Jun, 2010 | The Cuttings Boulderfield | ||
Southwest Arête | f5+ * | Sent β | Tris.west | 27 Jun, 2010 | The Cuttings Boulderfield | ||
Sheriff Fat Man | f5+ | Sent O/S | Tris.west | 27 Jun, 2010 | The Cuttings Boulderfield |