showing 1-25
UKH
Name Grade Style Date Crag name
Platform Rib IV 5 ** 2nd O/S 5 Mar Ben Nevis
Waterfall Gully IV 4 * 2nd O/S 4 Mar Ben Nevis
Chequers Buttress HVS 5a *** 2nd dnf 12 Oct, 2019 Froggatt Edge
Allen's Slab S 4a ** Lead O/S 12 Oct, 2019 Froggatt Edge
Three Pebble Slab HVS 5a *** 2nd O/S 12 Oct, 2019 Froggatt Edge
Heather Wall HVD 3c *** Lead O/S 12 Oct, 2019 Froggatt Edge
Sunset Slab HVS 4b *** 2nd 12 Oct, 2019 Froggatt Edge
Tody's Wall HVS 5a *** 2nd 12 Oct, 2019 Froggatt Edge
Sunset Crack HS 4b ** Lead O/S 12 Oct, 2019 Froggatt Edge
Pinnacle Direct S 4a * TR 5 Sep, 2019 Almscliff
Rough Crack VD * Lead rpt 5 Sep, 2019 Almscliff
Stew Pot HVD * 2nd rpt 5 Sep, 2019 Almscliff
Pinnacle Flake Climb S 4a * 2nd rpt 5 Sep, 2019 Almscliff
Fluted Columns HVD 3c *** TR rpt 5 Sep, 2019 Almscliff
Fluted Crack S 4b * Lead rpt 5 Sep, 2019 Almscliff
Lichen Slab VD * Lead rpt 2 Sep, 2019 Brimham Rocks
Cannon Route D * Solo 20 Aug, 2019 Brimham Rocks
Maloja VS 4c ** Lead O/S 20 Aug, 2019 Brimham Rocks
Right Wall VS 4c ** 2nd O/S 20 Aug, 2019 Brimham Rocks
Slab Arete VD * Solo rpt 19 Aug, 2019 Brimham Rocks
Cyclops S 4a * Solo rpt 19 Aug, 2019 Brimham Rocks
Lichen Slab VD * TR rpt 19 Aug, 2019 Brimham Rocks
Birch Tree Wall VS 4c *** TR O/S 19 Aug, 2019 Brimham Rocks
Lichen Slab VD * TR O/S 19 Aug, 2019 Brimham Rocks
Slab Arete VD * Solo rpt 19 Aug, 2019 Brimham Rocks