showing 1-25
Name Grade Style Date Crag name
Route 5 HVD 4a 2nd O/S 14 Sep Burbage North
Route 3 S 4a * 2nd O/S 14 Sep Burbage North
Steptoe M * Lead O/S 14 Sep Burbage North
Triangle Buttress Arête VD * TR rpt 14 Sep Burbage North
Triangle Crack HVD 4a * 2nd O/S 14 Sep Burbage North
Edge Route M Solo O/S 8 Sep Slipstones
Yaud Wall VS 5a 2nd dog 8 Sep Slipstones
Pa's Route S 4b TR O/S 8 Sep Slipstones
Pinnacle Chimney D Lead β 8 Sep Slipstones
Double Mantleshelf VD TR 8 Sep Slipstones
Jug Handle Pull Up VD TR 8 Sep Slipstones
Cracklap HS 4b * TR O/S 26 Aug Witches' Quarry
Serenity S 4a * 2nd O/S 26 Aug Witches' Quarry
Nozag VS 4c *** 2nd dog 21 Jul Castle Naze
The Staircase M * Lead O/S 21 Jul Windgather Rocks
Mississippi Crack S 4a ** 2nd O/S 21 Jul Windgather Rocks
Traditional HS 4a * 2nd O/S 21 Jul Windgather Rocks
North Buttress Arête Direct VS 5a ** 2nd O/S 21 Jul Windgather Rocks
Nose Direct HVD ** 2nd O/S 21 Jul Windgather Rocks
High Buttress Arête D *** 2nd O/S 21 Jul Windgather Rocks
Gabriel M Lead RP 14 Jul Stanage Plantation
Soft Shoe HS 4c * TR O/S 14 Jul Stanage Popular
Dun HS 4b * 2nd O/S 14 Jul Stanage Popular
Dover's Wall, Route 1 S 4b * 2nd O/S 14 Jul Stanage Popular
Straight Chimney VD TR O/S 14 Jul Stanage Popular