showing 1-25
Name Grade Style Date Crag name
Payback HS 4a * Lead O/S 20 Aug, 2017 Pot Scar
Equity S 4a * Lead O/S 20 Aug, 2017 Pot Scar
Nirvana VS 4c *** Lead O/S 20 Aug, 2017 Pot Scar
Cleft Wall Route 2 VS 5a * 2nd dog 10 Oct, 2016 Stanage Plantation
Cleft Wall Route 1 HS 4b * Lead 10 Oct, 2016 Stanage Plantation
Chockstone Chimney HVD 3c ** 2nd 10 Oct, 2016 Stanage Plantation
Three Fingers 6a * Lead 4 Jul, 2013 The Cuttings
Juggernaut 5a Lead 4 Jul, 2013 The Cuttings
Opus 5a * Lead 4 Jul, 2013 The Cuttings
Amazonia 4c * Lead 4 Jul, 2013 The Cuttings
The Great Hamburger Disaster 4c * Lead 4 Jul, 2013 The Cuttings
Little Chef 5c * Lead 4 Jul, 2013 The Cuttings
The Anchorman.com 5a Lead 26 May, 2013 Castleberg Crag
Settle Festival 4a ** Lead 26 May, 2013 Castleberg Crag
3 Peaks Bunk Room 5a * Lead 26 May, 2013 Castleberg Crag
Route B HVD ** AltLd O/S 30 May, 2010 The Dewerstone
Central Groove HS 4b *** AltLd O/S 30 May, 2010 The Dewerstone
Pinnacle Buttress VD ** AltLd O/S 30 May, 2010 The Dewerstone
Trident Eliminate HS 4b * Lead 30 May, 2009 Harborough Rocks
Trident Groove VD * Lead 30 May, 2009 Harborough Rocks
Trident Arete VD * Lead 30 May, 2009 Harborough Rocks
Spider Chimney HVD 3c * Lead 30 May, 2009 Harborough Rocks
The Arete S 4a * Lead 30 May, 2009 Harborough Rocks
Desperation S 4a Lead 30 May, 2009 Harborough Rocks
Legs Over VS 4b * Lead 30 May, 2009 Harborough Rocks