Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Final Solution | E3 5c ** | 2nd | Si 2 | 14 Apr, 2012 | Holyhead Mountain | ||
Breaking the Barrier | E1 5b *** | Lead O/S | Si 2 | 14 Apr, 2012 | Holyhead Mountain | ||
The Eternal Optimist | E2 5b ** | Lead O/S | Si 2 | 14 Apr, 2012 | Gogarth North Stack and Main... | ||
The Assassin | E3 5c ** | AltLd O/S | Si 2 | 14 Apr, 2012 | Gogarth North Stack and Main... | ||
Contusion | 6c ** | Lead | Si 2 | 13 Apr, 2012 | Pen Trwyn | ||
Axle Attack | 7a+ *** | Lead dog | Si 2 | 13 Apr, 2012 | Pen Trwyn | ||
Under the Boardwalk | 6c *** | Lead | Robin, Si 2 | 13 Apr, 2012 | Lower Pen Trwyn | ||
Consenting Adults | 7a ** | Lead RP | Si 2 | 9 Apr, 2012 | Malham Cove | ||
Strike | E4 6a ** | 2nd O/S | Si 2 | 1 Apr, 2012 | Gogarth North Stack and Main... | ||
U.F.O. | E2 5c * | AltLd O/S | Si 2 | 1 Apr, 2012 | Gogarth North Stack and Main... | ||
The Moon | E3 5c *** | AltLd O/S | Si 2 | 1 Apr, 2012 | Gogarth South Stack | ||
The Crucifix - Sit Down Start | V4 | Sent β | Robin, Si 2 | 29 Mar, 2012 | Almscliff | ||
Clematis | E2 5c * | TR | Robin, Si 2 | 29 Mar, 2012 | Almscliff | ||
The Nose | VS 4c * | Solo | 29 Mar, 2012 | Almscliff | |||
Zig Zag Direct | VS 4c * | Solo | 29 Mar, 2012 | Almscliff | |||
CD 8 Problem 15 | V3 | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
Cave Triplet Arete | f6B+ * | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
Curving Groove | f4+ * | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
Low Cave Traverse | f6C+ * | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
High Cave Traverse | f6A * | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
Metal Mickey | f6A+ * | Sent | 26 Mar, 2012 | Woodhouse Scar | |||
The Rib | VS 5a * | Solo | 24 Mar, 2012 | Windgather Rocks | |||
The Rib Right-hand | HVD 4a | Solo | 24 Mar, 2012 | Windgather Rocks | |||
The Staircase | M * | Solo | 24 Mar, 2012 | Windgather Rocks | |||
Green Slab | S 4b * | Solo | 24 Mar, 2012 | Windgather Rocks |