Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Orange Flash | HVS 5a ** | Lead O/S | Chris Parrott | 2 Aug | Auchinstarry Quarry | ||
Red Lead | VS 5a *** | Lead O/S | Chris Parrott | 2 Aug | Auchinstarry Quarry | ||
Access Route | D * | Lead O/S | Chris Parrott | 2 Aug | Auchinstarry Quarry | ||
Scream Slab | E2 5c | Lead O/S | Chris Parrott | 2 Aug | Auchinstarry Quarry | ||
Anarchist | VD | Lead O/S | Chris Parrott | 2 Aug | Auchinstarry Quarry | ||
South to North Traverse | Grade-3 *** | Solo O/S | 1 Aug | The Cobbler | |||
North Peak | Grade-1 | Solo O/S | 1 Aug | The Cobbler | |||
Doorway Route | Grade-3 ** | Solo O/S | 1 Aug | The Cobbler | |||
Central Peak, South-East Arete | M ** | Solo O/S | 1 Aug | The Cobbler | |||
South Peak, North-West Face | D ** | Solo O/S | 1 Aug | The Cobbler | |||
Southeast Ridge (Summer) | M ** | Solo O/S | 1 Aug | The Cobbler | |||
Centurion | HVS 5a *** | AltLd O/S | elizabethporter, Chris | 13 Jul | Ben Nevis | ||
Green Meanie | f5 | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Hard Cheddar | f5+ *** | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Cheddar Direct | f4+ *** | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Astronomy | VB | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Nemesis | f5 * | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Left Direct | f3 ** | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Zig Zag | f4 *** | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Right Edge | f3+ | Sent O/S | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Ungava | f4+ | Sent rpt | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Friar's Mantle | f4+ *** | Sent rpt | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Fridays Fill | f3 * | Sent rpt | Chris Parrott | 28 Jun | Dumbarton Rock | ||
Left Edge | f3 * | Sent rpt | Chris Parrott | 28 Jun | Dumbarton Rock | ||
The Cracks | HS 4c *** | AltLd O/S | Anya Agulova | 20 Jun | Dinas Mot |