Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Bidein Druim Nan Ramh Traverse | 3S *** | Lead | 26 May, 2014 | Bidein Druim nan Ramh | |||
The Spur (Summer) | Grade-2 * | Lead | 26 May, 2014 | Sgurr an Fheadain | |||
Sigh | S | Solo | 25 May, 2014 | Torr a Chruidh | |||
Rio | HS 4b * | Lead | Ann | 15 May, 2014 | Craig Bwlch y Moch (Tremadog) | ||
Mysophobia | VS 4c | Lead | Ann | 15 May, 2014 | Craig Bwlch y Moch (Tremadog) | ||
Oberon Variation Finish | HS 4c | Lead | Ann | 15 May, 2014 | Craig Bwlch y Moch (Tremadog) | ||
Oberon Original Start | HS 4c | Lead | Ann | 15 May, 2014 | Craig Bwlch y Moch (Tremadog) | ||
Knell for a Jackdaw | S * | Lead | Ann | 15 May, 2014 | Craig Bwlch y Moch (Tremadog) | ||
Jutland | 4b ** | Lead | 11 May, 2014 | Blacknor South | |||
Imperfect | 3c * | Lead | 11 May, 2014 | Blacknor South | |||
Princess Bolting | 4a | Lead | 11 May, 2014 | Blacknor South | |||
Eating Bush | 5b | Lead | 11 May, 2014 | Blacknor South | |||
Do Ixtlan | 5b * | Lead | 11 May, 2014 | Blacknor South | |||
Well Done Poppet | 5c * | Lead | 11 May, 2014 | Blacknor South | |||
Fallen Slab | 3a *** | Lead | 11 May, 2014 | Blacknor Beach | |||
Fallen Slab Arête | 3a *** | Lead | 11 May, 2014 | Blacknor Beach | |||
Diamond Rib | HS 4a * | 2nd | Sarah B | 9 May, 2014 | Meadfoot Quarry | ||
Rubber Soul | HVS 5a | Lead | Sarah B | 9 May, 2014 | Meadfoot Quarry | ||
Crinoid | E2 5c *** | TR | Sarah B | 9 May, 2014 | Telegraph Hole | ||
Raven Face | VD * | 2nd | crater | 5 May, 2014 | The Dewerstone | ||
Fly On The Wall | HS 4b ** | 2nd | crater | 5 May, 2014 | The Dewerstone | ||
Vineyard | VS 4b ** | Lead | crater | 5 May, 2014 | The Dewerstone | ||
Long Rock Eliminate | HVS 5a * | Lead | crater | 4 May, 2014 | Baggy Point | ||
Kinkyboots | VS 4c ** | Lead | crater | 4 May, 2014 | Baggy Point | ||
Marion | HS 4a ** | 2nd | crater | 4 May, 2014 | Baggy Point |