Name | Grade | Style | Partner(s) | Notes | Feedback | Date | Crag name |
---|---|---|---|---|---|---|---|
Wall Cracks | HVS 5a * | Lead O/S | 7 May, 2013 | Morlais Quarries | |||
Castle Wall | VS 4b * | Lead O/S | 7 May, 2013 | Morlais Quarries | |||
Thrutch | VS 4c ** | Lead O/S | 28 Feb, 2013 | Witches' Quarry | |||
Halloween Outing | S 4a * | Lead O/S | 28 Feb, 2013 | Witches' Quarry | |||
Broomstick | VS 5a * | Lead O/S | 28 Feb, 2013 | Witches' Quarry | |||
Split Block Overhang | HVS 5a | Lead rpt | 25 Feb, 2013 | Cadshaw Rocks | |||
Crack And Wall | S 4a * | Lead rpt | 25 Feb, 2013 | Cadshaw Rocks | |||
East Face Climb | VD | Lead rpt | 25 Feb, 2013 | Cadshaw Rocks | |||
Trapeze Direct | VS 4c * | Lead O/S | 23 Mar, 2012 | Froggatt Edge | |||
Slab Recess Direct | HS 4c * | Lead O/S | 23 Mar, 2012 | Froggatt Edge | |||
Silver Crack | HS 4c * | Lead O/S | 23 Mar, 2012 | Froggatt Edge | |||
Turret Crack | HS 4b | Lead O/S | 21 Mar, 2012 | Froggatt Edge | |||
Sunset Crack | HS 4b ** | Lead O/S | 21 Mar, 2012 | Froggatt Edge | |||
North Climb | S 4a * | Lead O/S | 21 Mar, 2012 | Froggatt Edge | |||
Wall End Holly Tree Crack | HS 4b * | Lead O/S | 19 Mar, 2012 | Stanage Plantation | |||
Wall End Flake Crack | VS 4c ** | Lead O/S | 19 Mar, 2012 | Stanage Plantation | |||
Crack 3 | D ** | 2nd O/S | 8 Mar, 2012 | Barmouth Slabs | |||
Main Slab | S 4a ** | Lead O/S | 8 Mar, 2012 | Barmouth Slabs | |||
Sunny Delight | MS | Lead O/S | 8 Mar, 2012 | Barmouth Slabs | |||
Zig Zag | VD ** | 2nd O/S | 8 Mar, 2012 | Barmouth Slabs | |||
Sugar Lumps | S | Lead O/S | 8 Mar, 2012 | Barmouth Slabs | |||
Spiral Stairs | VD *** | 2nd O/S | 7 Mar, 2012 | Dinas Cromlech | |||
The Railway children | 6a ** | Lead O/S | 6 Mar, 2012 | Australia | |||
Major | HVS 5a ** | Lead RP | 5 Mar, 2012 | Pot Hole Quarry (Three... | |||
The Dog | HVS 5b *** | Lead RP | 5 Mar, 2012 | Pot Hole Quarry (Three... |