showing 1-25
Name Grade Style Date Crag name
Possibility S 4a * 2nd O/S 22 Mar Bamford Edge
Introduction S 4a 2nd O/S 22 Mar Bamford Edge
Bracken Crack VD * Lead O/S 22 Mar Bamford Edge
Bamford Wall S 4a ** Lead O/S 22 Mar Bamford Edge
Centrepiece 6a * 2nd 30 Dec, 2019 Giggleswick North
Three Steps to Heaven 5c ** 2nd 30 Dec, 2019 Giggleswick North
Ledge Wall f3+ Sent 7 Jul, 2019 Curbar Edge
One Inch Arête f3 Sent 7 Jul, 2019 Curbar Edge
One Inch Crack f3 Sent 7 Jul, 2019 Curbar Edge
Curved Rib f3 Sent 7 Jul, 2019 Curbar Edge
Fishy f4 * Sent 7 Jul, 2019 Curbar Edge
Bore-hole Traverse f5 * Sent 31 May, 2019 Curbar Edge
Bore-hole Crack f3+ Sent 31 May, 2019 Curbar Edge
Bore-hole Wall f3+ Sent 31 May, 2019 Curbar Edge
Side-wall Flake f5 * Sent 31 May, 2019 Curbar Edge
Side-wall Crack f4 * Sent 31 May, 2019 Curbar Edge
Side-wall Arête f4 * Sent 31 May, 2019 Curbar Edge
Track Crack f4+ * Sent 31 May, 2019 Curbar Edge
Trackside Scoop f4+ * Sent 31 May, 2019 Curbar Edge
Little Chamonix VD *** 2nd 18 May, 2019 Shepherd’s Crag
A Fistful of Dollars VS 4c * 2nd 18 May, 2019 Shepherd’s Crag
The Double Helix 6a+ * TR 31 Mar, 2019 Penmaen Head
Go With the Flow 6a * TR 31 Mar, 2019 Penmaen Head
Tan y Lan Kids 5a * TR 31 Mar, 2019 Penmaen Head
Ffrind 4a * Lead 29 Mar, 2019 Castle Inn Quarry